loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

LED lighting energy-saving promotion has achieved good results in the United States

US Department of Energy ( UnitedStatesDepartmentofEnergy, DOE) A survey was conducted to study how much energy can be saved by the application of LED lighting. According to the survey, LED lights installed and used in the United States in 2012 brought energy savings of 71 trillion British thermal units (BTU), Equivalent to saving 6 per year. $7. 5 billion in expenditure. The report also pointed out that if the United States replaces all lighting fixtures with LED, the energy cost savings can reach 39 billion US dollars. LED lighting in the United States has achieved energy conservation results. Due to the high electricity price in the United States, the price of LED lighting products in the United States is also continuously declining. It is foreseeable that LED development in the United States will be faster and faster. The US Department of Energy estimates that if the entire lighting device is converted to LED, it can save about 3. 5% of energy per year. 9 trillion British thermal units, which will be equivalent to about US $3. 7 billion in annual energy costs. The amount accounted for about half of the National lighting energy consumption in 2012.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service