loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Jinan railway station tower clock upgrade maintenance using LED lighting

Tomorrow, jinan railway station square tower clock will start construction of maintenance, after the completion will be upgraded. During the maintenance station tower clock normal use will be affected. According to introducing, in the 1990 s, the railway station square tower clock jinan railway station completed together with the new investment to

tomorrow, jinan railway station square tower clock will start construction of maintenance, after the completion will be upgraded. During the maintenance station tower clock normal use will be affected.

according to introducing, in the 1990 s, the railway station square tower clock as new jinan railway station completed together put into use. The railway station square tower clock host aging, dial, whose hands corrosion is serious, affect the normal use. For travelers to provide more accurate time, according to jinan railway station will be on September 1, from August 19 solstice of square tower clock upgrade maintenance.

the maintenance will to upgrade the tower clock host, painted dial, will replace the clock at the same time. After repair, the tower clock will use LED lighting, convenient time to show more clearly. At the same time, the LED street lamp, tower clock the host will install GPS satellite automatically when the school system, adjust time, ensure the accuracy.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service