Risk factors 1, the house property right and the power is different in the field, frequently do not agree with property right person the power customer, EMC contract cannot counter the ownership of the property owner, so investors must be subject to consent by the property owner legitimate use workshop construction of roof and issue a
1 risk factors. Owner is different from electricity in actual operation, often appear inconsistent between electricity and the electricity. The ownership of the EMC contract owners can't refuse. Therefore, the owner must agree to investors can legally use workshop roof, and issue a certificate of ownership of the construction site, to eliminate the risk of infringement of their rights and interests of investors. 2 photovoltaic components, equipment, quality problem is one of the important equipment, photovoltaic power plant usually single bid. However, these components are prone to cracking, the problem such as lightning, but there are many reasons may cause the above problem. Therefore, the quality problem of the equipment, especially the quality problem of the parts, very worthy of attention. The risk of major parts quality problem is after the date of delivery. For investors, although the risk is not move, but found the quality problem after delivery will still be harmful to investors. Parts purchasing, therefore, should be strictly stipulated in the contract of the warranty period, the scope of the quality problem and quality problem occurs after the relief way, in order to maintain their own rights and interests. 3, engineering quality problems in the process of photovoltaic power station construction, equipment damage due to improper operation easily, such as unloading, installation, storage process may damage caused by improper operation part. In addition to strengthen supervision, the responsibility of the contractor should be strict rules in the turnkey contract. There is a relatively common but important, component damage may be caused by quality problems and improper operation. In this case, it is difficult to distinguish between their respective responsibility, is not conducive to protect the rights and interests of investors, it is necessary to set the rights and responsibilities. Parts may be damaged due to quality problems and improper operation. According to the tort liability act, this is a kind of common infringement behavior. Although can remedy through legal channels, this article focuses on investment evaluation of power plant, the purpose is through the project before the project implementation assessment will all kinds of risks and costs to a minimum. As a result, not repeat here. 4. The extension of the power station construction in the construction of the photovoltaic power station investment, construction cycle length is associated with the capitalization and payback period of investment. The shorter the construction cycle, power station earlier for earnings and capital returns. In actual construction, however, often there will be a time limit for a project long problem. One reason is that the project construction plan and construction schedule control is bad, lead to serious problems in the equipment supply and construction disconnect. Second, the individual project failed to reach agreement with tiantai owner for tiantai maintenance, greatly affect the normal construction progress of the project. Therefore, before the project starts, the technology has been the engineering survey, the owner with the roof in advance agree on maintenance matters, next to the detailed construction plan, and strictly carry out. 5, corporate default electricity distributed photovoltaic power generation project of electricity charge must first determine the meter with the initial time and the readings of metering device. However, because of the electricity charge is directly related to emc contract the interests of both sides, and in the actual operation, the investors to consumers agree on electricity of the initial time and reading. With the need of photovoltaic power station connected to the grid, and involves the power supply department, power supply department measurement start time and start reading can use its credibility in the EMC contract agreement.