loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Introduction to solar energy street lamp base casting

1, determine the floorlamp position; Survey and geological conditions, if the surface of the 1 m 2 are all a hotchpotch of soft soil, the excavation depth should be deepened; At the same time to confirm the excavation position under no other facilities ( Such as cable, pipes, etc. ) , street lamp at the top of the shade objects for a long time, otherwise

1, determine the position of the vertical light; According to the geological survey, if the surface is 1. 2 meters of soft soil, the excavation depth should be deepened. At the same time, we should confirm no other facilities ( Such as cables and pipelines, etc. ) Under excavation, and no long street lamp at the top of the sun shade, otherwise, should be appropriate to change position. 2, reserved at the location of the vertical lamps and lanterns, The excavation) The pit of conform to the standard ( According to the height of the light pole design depth) ; Should be embedded parts of positioning and casting. Embedded parts are placed in the center of the square hole, one end of the PVC pipes placed in the middle of the embedded parts, the other end is placed in the place of battery. Keep the embedded parts and foundation and the ground at the same horizontal plane ( Or screw at the top and the original ground in the same horizontal plane, depending on the field need) On one side, should be parallel to the road; Only in this way, light can be upright and not skewed. And then pouring concrete C20 and fixed, casting shall not stop vibrating plate, to ensure the high dense. 3. After completion of construction, clear in time positioning plate of residual sludge, and waste oil clean up the impurity on the bolt, Bolt location with tape before construction, prevent excessive magazine clinging, affect the installation progress) 。 4, concrete during solidification, and often to water conservation; Droplight can only be installed in concrete after complete solidification ( Usually more than 72 hours) 。

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service