1, determine the floorlamp position; Survey and geological conditions, if the surface of the 1 m 2 are all a hotchpotch of soft soil, the excavation depth should be deepened; At the same time to confirm the excavation position under no other facilities ( Such as cable, pipes, etc. ) , street lamp at the top of the shade objects for a long time, otherwise
1, determine the position of the vertical light; According to the geological survey, if the surface is 1. 2 meters of soft soil, the excavation depth should be deepened. At the same time, we should confirm no other facilities ( Such as cables and pipelines, etc. ) Under excavation, and no long street lamp at the top of the sun shade, otherwise, should be appropriate to change position. 2, reserved at the location of the vertical lamps and lanterns, The excavation) The pit of conform to the standard ( According to the height of the light pole design depth) ; Should be embedded parts of positioning and casting. Embedded parts are placed in the center of the square hole, one end of the PVC pipes placed in the middle of the embedded parts, the other end is placed in the place of battery. Keep the embedded parts and foundation and the ground at the same horizontal plane ( Or screw at the top and the original ground in the same horizontal plane, depending on the field need) On one side, should be parallel to the road; Only in this way, light can be upright and not skewed. And then pouring concrete C20 and fixed, casting shall not stop vibrating plate, to ensure the high dense. 3. After completion of construction, clear in time positioning plate of residual sludge, and waste oil clean up the impurity on the bolt, Bolt location with tape before construction, prevent excessive magazine clinging, affect the installation progress) 。 4, concrete during solidification, and often to water conservation; Droplight can only be installed in concrete after complete solidification ( Usually more than 72 hours) 。