1, determine the floorlamp position; Survey and geological conditions, if the surface of the 1 m 2 are all a hotchpotch of soft soil, the excavation depth should be deepened; At the same time to confirm the excavation position under no other facilities ( Such as cable, pipes, etc. ) , street lamp at the top of the shade objects for a long time, otherwise

1, determine the position of the vertical light; According to the geological survey, if the surface is 1. 2 meters of soft soil, the excavation depth should be deepened. At the same time, we should confirm no other facilities ( Such as cables and pipelines, etc. ) Under excavation, and no long street lamp at the top of the sun shade, otherwise, should be appropriate to change position. 2, reserved at the location of the vertical lamps and lanterns, The excavation) The pit of conform to the standard ( According to the height of the light pole design depth) ; Should be embedded parts of positioning and casting. Embedded parts are placed in the center of the square hole, one end of the PVC pipes placed in the middle of the embedded parts, the other end is placed in the place of battery. Keep the embedded parts and foundation and the ground at the same horizontal plane ( Or screw at the top and the original ground in the same horizontal plane, depending on the field need) On one side, should be parallel to the road; Only in this way, light can be upright and not skewed. And then pouring concrete C20 and fixed, casting shall not stop vibrating plate, to ensure the high dense. 3. After completion of construction, clear in time positioning plate of residual sludge, and waste oil clean up the impurity on the bolt, Bolt location with tape before construction, prevent excessive magazine clinging, affect the installation progress) 。 4, concrete during solidification, and often to water conservation; Droplight can only be installed in concrete after complete solidification ( Usually more than 72 hours) 。

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Smart Lighting: Every Beam Illuminates Your Ideal Life
In horticulture, each day brings new challenges. Unpredictable weather, fluctuating light conditions, and rising energy costs make it difficult to ensure consistent crop quality and yield. But what if growers no longer had to leave success to chance? At ALLTOP, we believe light should work for you, not against you. With nearly 16 years of experience, we develop intelligent LED lighting solutions that empower growers to optimize every aspect of plant growth—helping you Control Your Perfect Day.
Fifteen Years of Good Deeds: ALLTOP Donates Another 230,000 to Expand Schools and Revitalize Henglan
On the evening of December 3rd, the 2025 Henglan Town Charity Walk Appreciation Gala concluded warmly. At this grand event themed "Expanding Schools and Revitalizing Henglan," Guangdong ALLTOP Lighting Co., Ltd. pledged an on-site donation of 230,000 RMB, interpreting the "Spirit of Fraternity" through action and contributing to the development of local education.
Congratulations on the Successful Launch of Guangdong ALLTOP Industrial Park!

The Guangdong ALLTOP Campus, spanning 50.24 mu with a 168,000 sqm built-up area, represents a 370 million RMB investment. It is projected to generate an annual output value of over 600 million RMB at full operation. Featuring advanced smart production lines and digital management systems, its core mission is to become a modern base for intelligent manufacturing.
CCTV Authority Spotlight: Alltop's Innovative Energy Storage Products Shine at Canton Fair

CCTV featured Alltop's innovative energy storage products at the Canton Fair, highlighting the company's technological strength and market leadership. The brand drew significant attention and orders at the event, with its booth attracting global visitors and showcasing advanced renewable energy solutions. The coverage underscored Alltop's expertise in energy storage systems and smart solar lighting, earning national recognition for its innovation.
Invitation | From October 15th to 19th, ALLTOP invites you to attend the 138th Canton Fair together!

The 138th China Import and Export Fair

Date: Oct. 15th-19th, 2025

Booth No.:14.3F33-34G10-11

Add: China Import and Export Fair Complex (Canton Fair Complex)
Global Witness, Technological Breakthrough! ALLTOP Showcases Comprehensive Solutions at Solar PV & Energy Storage World Expo

Solar PV & Energy Storage World Expo

The 17th Guangzhou Intl Solar Photovoltaic & Energy Storage Exhibition

th No.:10.2 B551

Date: 8th-10th, August 2025

ADD: Area B, China Import & Export Fair Complex, Guangzhou
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect