loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Integrated solar street lamps light

Battery is a very important part of inverter system. User when battery of choose and buy, should choose good quality, power larger varieties, large capacity storage battery with long time, at the same time can provide to instant on high-power electric equipment enough current

battery is an important part of the inverter system. When buying a battery, the user should choose good quality and large varieties of power consumption. Large capacity battery can be used for a long time, at the same time, they can provide the high-power electrical equipment starts with enough electric current. For some of the high-power electrical equipment, it is recommended that the battery should be 200 amperes ( & Lt1000 watts) When the power is higher, it is best to use 400 ampere of the battery. According to the use of electric equipment to determine the capacity of the battery, the simplest method is to all electrical power multiplied by the battery charged each time interval between the use of time. Here's how to determine the capacity of the battery solar street lamps.

to match the inverter battery should be able to do deep circulation charge and discharge of the lead-acid battery. For which has the function of depth of discharge the battery solar street lamps, power is usually measured in ampere hour ( AH) , said the unit time ( Usually for 20 hours) Can provide the current value. For example, the battery capacity is 100 amps means 5 amperes of current can continuous power supply for 20 hours or 20 & times; 5 = 100.

to calculate electric power consumption of the unit is just a power or volt ampere. In the case of charge once a day. Specific results are as follows: negative load power consumption time ( Between charges) Watt hour ( Power & times; Use the time) TV and VCD 115 w (3 hours 1 hours a day) 345 coffee machine 750 watts (1 hour 20 minutes a day) Half an hour (800 w, 750 microwave oven 10 minutes a day) The total 1665 watts 4 400. 5 hours 1495 watts divided by 10 converts wattage ampere hour ( 30℃) : 1495 watts & divide; 10 = 149. 5 ampere hour. To the load, 150 ampere hour battery can meet the need. However, in this case, the battery to completely discharge, and the ideal state of normal battery discharge is 50%, so the user need 300 ampere hour battery to the load. The bigger the battery ( Ampere hour) , the greater the power capacity, the smaller the possibility of battery over discharge. The service life of the battery depends on the depth of discharge. The discharge depth, the greater the shorter service life. When the load increases, the battery capacity should also be increased. This may need to use multiple batteries. To connect two battery method is to connect the battery positive electrode and the anode, cathode and anode connection. In this case, the power of the battery will double, voltage is the same as the voltage in the battery. Not recommended for connection of different manufacturers or different security time battery, because it can reduce the service life of the battery.

the above is about how to determine the capacity of the battery solar street lamps. If you have any other requirements, can be directly or dial the hotline counseling online customer service. We will do our best to service for you.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service