loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Installation explanation of split anti-glare floodlight NFC9112 anti-glare ceiling light

Split-type anti-glare floodlight NFC anti-glare ceiling light installation explanation year, month and day, this NFC anti-glare floodlight brought to you today, let us take a look at its installation method and detailed parameters. Use a socket wrench to unscrew the two fastening bolts on the ballast box cover, open the ballast box cover, and introduce one end of the three-core cable of the lamp into the ballast cavity through the introduction device of the ballast outlet Inside, connect the yellow-green wire, blue wire, and brown wire to the ballast terminals No., No., and No., and then use the lead card to compress the three-core cable before tightening the compression nut. According to the site environment and lighting needs, determine the installation location and appropriate installation method of the lamps and ballasts. According to the distance from the ballast to the V power contact, prepare a three-core cable with a corresponding length of φ~mm. In the determined installation position, fix the lamp and the ballast. When replacing the bulb, first cut off the power, loosen the lock nut on the side of the lamp cap, open the lamp cap through the hinge flip mechanism, unscrew the old bulb, and replace it with a new one. Close the ballast box cover and tighten the fastening bolts, and then connect the other end of the three-core cable to the V power supply to achieve lighting. Pass one end of the prepared three-core cable into the ballast cavity through the lead-in device of the input port of the ballast box, and then connect the L wire, N wire and ground wire to the ballast, and number positions respectively. On the terminal, and tighten the three-core cable before tightening the compression nut. Rated voltage VAC Hz enclosure protection IP rated power: // MH/HPS gas discharge bulb inlet thread G/ lead-in cable φ~φmm shape size lamp body φ×mm ballast box××mm

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service