How to repair the outdoor solar energy lamp installation method and the maintenance of high lift

Light, maintenance and overhaul - Drive gear maintenance - 1. Lamp plate fell down support for maintenance, after maintenance when first clean-up, look for broken wire rope phenomenon such as corrosion, wear, whether cable connector is loose. 2. Open the worm gear and worm reducer



high lamp maintenance and overhaul

- Drive gear maintenance -

1. Lamp plate fell down support for maintenance, after maintenance when first clean-up, look for broken wire rope phenomenon such as corrosion, wear, whether cable connector is loose.

2. Open the worm gear and worm reducer 【 Worm gear and worm reducer is a kind of dynamic convey institutions, using gear speed converter, motor ( The motor) Number of rotary rotary deceleration to want, and get a larger torque. 】 Cover, check the worm gear worm gear wear, with or without axial channeling.

3. Check the gear, shaft section, the phenomenon such as presence of wear and tear.

4. Check whether there is any loose on the fastening screw. Led solar street light' Solar street light is a crystalline silicon solar battery power supply, valve control type sealed and maintenance-free battery ( Gel battery) Store electricity, super bright LED as light source, lamps and lanterns and controlled by the intelligent charging and discharging controller, is used to instead of the traditional public power lighting lamps. 】

5. Transmission oil ( Fat) Too dirty, should be replaced, should guarantee is worm gear and worm [ Worm and worm wheel mechanism is used to transfer between two alternating axis movement and power. 】 Enclosure you have plenty of oil, less oil or no oil is forbidden.

6. Maintenance overhaul once every quarter, give priority to with inspection, found that the problem solves promptly, parts badly worn or damaged should be replaced in a timely manner.

- Drive gear overhaul -

1. Overhaul for once a year, should be fully check the worm gear, worm, gear, bearing, pulley and shaft parts of wear and the running state of the motor.

2. When the surface of the worm gear and worm gearing have wear and the running state of the motor.

3. When the wire rope with local broken wires ( No more than 3) Or should be replaced when the wear or obvious shortcomings.

4. When the bearing inner and outer ring rolling is a little touched, should be replaced when the crack is serious.

5. Shaft and roller, shaft and the pulley and the tolerance clearance of the bearing is greater than zero. 5, must be changed depending on the situation.

6. The motor if abnormal sound, vibration or noise insulation damage, leakage should be repair or replacement.

maintenance of lamps and lanterns: check the main cables and electrical components for circuit, trauma, and other problems.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service