shandong light, 【 Light, generally refers to more than 15 meters steel conical light pole and high-power modular fixtures are composed of new type of lighting. 】 Using range is very wide, usually applied in large area lighting places. So shandong high lamp is how to install? The following by shandong yu sheng lighting for everyone to do detailed introduction.
shandong light, using range is very wide, usually applied in large area lighting places. So shandong high lamp is how to install? The following by shandong yu sheng lighting for everyone to do detailed introduction.
1, before installation
1, according to the loading and packing list carefully counted all artifacts.
2, check whether components damaged, bent, and twisted, zinc layer is damaged.
3, each section on the rod body signs indicate the type of the rod body, order number, block number. In the bar side of the body to indicate the weight of the rod body with a marker pen. Is issued by the cargo is correct, the crane lifting capacity is enough.
4, according to the drawing provided by the maximum and minimum socket length, on the rod body ready, for the use of the socket.
2, installation time
1, each joining together to provide a set of length, but as a result of such as manufacturing, and installation error and physical factors, there is the change of the socket length, thus provide minimum and maximum lengths of the socket socket length.
2, in order to make the installation is convenient, may require lubrication fitting surface. Notice shall not be used lubricating oil to prevent leakage and pollution of the rod body, can use soap water lubrication socket inside and outside surface.
3, socket to exert the necessary force at both ends, to get close the socket.
3 after install,
1, lifting the localization of lamps and lanterns, technical personnel in charge of the light, calibration, commissioning, wiring and lighting work. Professional electrician is responsible for the inspection of power lines, giving distribution, handyman responsible for organizing construction phenomenon.
2, installation and debugging of lamps and lanterns, normal light, technicians will light, all technical data transferred to the designated professionals ( Professional electrician) or unit And guiding light, some specific operational problems in the maintenance, and acceptance of the installation work.