loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

How to install solar street light?

Lamp now relevant to our daily life, to the metropolis, down to the countryside, street light got popular, but the dosage of street lamps, more demand for electricity, so can not develop new solar street light. Solar street lamps placed: 1) 。 Light pole,

street lamp now is closely related to our daily life. Street lamps are widely used in the big cities and villages. However, due to the use of street lights and more demand for electricity, new solar street light can't development.

the installation of solar street light: 1) 。 After installing light pole, began to look at all of the components ( Solar panels, battery, light source) The wire is connected to the controller. ( Please refer to the specific controller wiring diagram) 2) 。 First of all, will be directly connected to the battery light source wires, check that the light is on. Then, the light source can be determined is the cathode wires ( Light is negative reverse connection, light is not bright, so light won't damage, lamp can be safely test) 。 Then, connect the positive wire of the light source to the controller corresponding to the light bulb icon on the red line of anode line and light source is connected to the controller corresponding to the light bulb icon on the black line. 3) Multimeter is file to check the battery socket is negative, the DC voltage to the battery positive electrode wire is connected to the controller on the battery icon corresponds to the red line, connect the battery negative line controller battery corresponds to the black line. 4) Multimeter is a DC voltage archives check solar panels across the electrodes of lead, will the positive line connected to the controller of the solar panels on the corresponding solar panels icon on the red line of the solar panels of the cathode lines connected to the controller corresponding solar panels on the black line. 5) 。 Controller has been debugging in the factory, intelligent lighting time has been adjusted. After the connection is not need to debug controller, controller will take the initiative to enter the state. 6) 。 Too thin: when placed the battery box, tighten the screws and waterproof threading pipe. Into the lamp base, waterproof threading pipe should be higher than 20 centimeters of above ground, to ensure that the lamp when the rain flooded the flange will not into the battery compartment. In addition, should be limited and select place, in order to avoid stagnation objects blocking solar panels, to prevent solar panels can't charge like a war.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service