The first step in the installation of solar street lamps and the most important thing is to do, like building a house, no matter what to do, the foundation is the most important forever. Foundation is used for fixed solar lamps and lanterns structure, at the same time, it also have the effect of placement and protect the storage battery.
the solar street lamps Solar street light is a crystalline silicon solar battery power supply, valve control type sealed and maintenance-free battery ( Gel battery) Store electricity, super bright LED as light source, lamps and lanterns and controlled by the intelligent charging and discharging controller, is used to instead of the traditional public power lighting lamps. 】 The first step in the installation and the most important thing is to do basic, like building a house, no matter what to do, the foundation is the most important forever. Foundation is used for fixed solar lamps and lanterns structure, at the same time, it also have the effect of placement and protect the storage battery. Because of all kinds of solar lamps and lanterns is high and the wind is different, the size of all kinds of solar lamps and lanterns of foundation strength is different. When construction, ensure the foundation strength and structure to meet the design requirements. Can according to the situation of construction site construction personnel, have the responsibility to choose a location for the installation of irrationality questioned and stop the construction, and to the relevant person in charge of reporting to the situation in the first place. Must be finished rectification within a time limit, according to the actual construction standards. Solar street light anchor cage installation steps are as follows: 1, in strict accordance with the solar street light foundation figure size ( By the construction personnel to determine the construction size) Along the road towards the excavation pit; 2, foundation, buried land cage' Cage, also known as the king of earth cage net, cage, etc. 】 On the surface of the must ensure that the level ( The level' Level is a kind of common measuring tool measuring the small Angle. 】 Measuring, testing) To the cage, anchor bolt 【 Mechanical components are installed on the concrete foundation, the bolt of the J shape, one end of the l-shaped embedded in concrete are used. 】 Must be connected to ground surface vertical (on Using square measuring, testing) ; 3, after the pit excavation placed 1 ~ 2 days, see if there were any groundwater seepage. If you have groundwater seepage, immediately stop the construction; 4, ready make solar street lamps before construction foundation needed tools and choose with construction experience of the construction personnel; Figure 5, and strictly in accordance with the solar street light foundation to choose the appropriate cement, the high soil ph must choose special cement resistance to acid and alkali; May not have in the sand and gravel soil and other impurities that affect the concrete strength; 6, foundation soil must consolidate around; 7, foundation of placing drain battery compartment must add drain or according to the drawing requirements. 8, before construction, threading pipe' Threading pipe full name 'building electrical insulation sleeve'. 】 Both ends must be sealed, avoid construction process and construction after the foreign matter to enter or congestion, lead to threading difficulty when installation or not thread; 9, solar street light foundation to produce after the completion of maintenance 5 ~ 7 days ( According to the weather condition) ; 10, solar street light foundation experienced qualified rear can for the installation of solar street light.