How to install solar energy components and good fixed garden light?

How to install solar energy components and fixed? Out of form a complete set of panels with sheath line, intercepting the corresponding length ( Usually the length of the light pole top to doors plus 1. 5 meters advisable, connection exists in parallel or in series and panels installed on the light pole on the side of the environment according to the actual ring



how to install solar energy components and fixed?

remove panels of form a complete set with the sheath line, intercepting the corresponding length ( Usually the length of the light pole top to doors plus 1. 5 meters advisable, connection exists in parallel or in series and panels installed on the environment in accordance with the actual environment of the light pole side) , will strip away at the end, and then use tape wrapped inside thread part 2 ( To avoid short circuit after front end plug in panels) And the label paper notes for panels, wire. Then use a screwdriver to open the panel box lid, guangdong cape lighting electric co. , LTD. Is engaged in the production design the solar street lamps Solar street light is a crystalline silicon solar battery power supply, valve control type sealed and maintenance-free battery ( Gel battery) Store electricity, super bright LED as light source, lamps and lanterns and controlled by the intelligent charging and discharging controller, is used to instead of the traditional public power lighting lamps. 】 , high lamp, solar street light 20 years production experience, to build the most professional solar street lamps, contact phone number: 13805257308. Crack, the front end of the wire, through the terminal block head of receiving terminal of the junction box ( Note: general draw a red line the panels of the anode, another version of cathode) , confirm the secure connection on the rear cover the lid of the box ( Note: this kind of connection mode for big department environment by using single block panels connection mode, panels in parallel or in series connection mode, please refer to appendix 1) 。 Using cable tie' Cable ties, nylon material of a kind of cable tie. 】 Will wire and fixed on the bracket of panels. Then the end of the wire from the set of head back through the hole in threading, again to the light pole through the light pole at the top of the doors and leads to the outside of the doors, so that the wiring. Finally install the panels to the department on top of a light pole, adjust Angle of panels ( Ensure that erected after facing south) In the end, a wrench and tighten the bolt. Note: A. The output of the battery components are negative to connect to the front of the controller, should adopt a way to avoid short answer. B。 Components of output lines should avoid to be exposed, and belt fastened. C。 Battery components towards to the south, the compass points to the shall prevail.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service