( 1) Disassembling and assembling address selection. Disassembling address should be installed in the nearby, so that the assembly after the delivery. In addition, the device address covered by rain wear, avoid the bump on the ground or fine sand and dirt and wear and tear of lamps and lanterns and defiled, etc. ( 2) Plant personnel
( 1) Disassembly and assembly address selection. Disassembly and assembly address should be and neighbouring device address, so that the assembly after the transportation. In addition, the device address covered with rain wear, in order to avoid the bump on the ground or fine sand and dirt and stains caused by light wear and scratches and stains. ( 2) Installation personnel and goods. There are 3 - Six professional installation personnel ( Installation tasks can increase when heavy installation personnel) 。 Each equipped with a set of equipment, including a multimeter, a large adjustable wrench ( Install base nut) And a small adjustable wrench ( Full install other nut) , a flat head screwdriver, a triangle lock tools, a cross screwdriver, and a long nose pliers, an insulating tape, a waterproof tape etc. In addition, also equipped with lifting equipment and lifting equipment. ( 3) According to the shipping list check lamps and lanterns; With reference to the packing list one by one to check all parts for knock against, wear, deformation, scratches and other damage, stop device and the unqualified products. When light pole placement component and the wear of attachments ( Such as solar energy battery components and a light) , it is necessary to use soft mat mat live them, in order to avoid unnecessary damage is found in the process of devices, such as scratches, etc. When placed under the light pole component, with the top of the light pole under the component needs to be supported by the hob, facilitate the lampposts components of the device. ( 4) Check the solar modules and wind generator nameplate, inspection standard, model and quantity is in accordance with the requirements. Do not conform to the requirements, should be replaced immediately, not far-fetched. ( 5) Check whether the solar modules and wind turbines is damage or scratches, if any should be replaced immediately. ( 6) Check the solar battery components are negative tag, to ensure correct is negative connection. Use multimeter to verify them, prevent malfunction and other phenomena. Authentication methods: use a digital multimeter red and black probe contact solar battery components of two electrodes, respectively. If it comes as the red probe to the corresponding electricity is positive, if negative, the red probe to owe the government's debt electrode. Other ways to detect fraudulent debt is the same.