loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

How to in Africa installed led street lamp, solar led street lamp market in

( 1) Disassembling and assembling address selection. Disassembling address should be installed in the nearby, so that the assembly after the delivery. In addition, the device address covered by rain wear, avoid the bump on the ground or fine sand and dirt and wear and tear of lamps and lanterns and defiled, etc. ( 2) Plant personnel

( 1) Disassembly and assembly address selection. Disassembly and assembly address should be and neighbouring device address, so that the assembly after the transportation. In addition, the device address covered with rain wear, in order to avoid the bump on the ground or fine sand and dirt and stains caused by light wear and scratches and stains. ( 2) Installation personnel and goods. There are 3 - Six professional installation personnel ( Installation tasks can increase when heavy installation personnel) 。 Each equipped with a set of equipment, including a multimeter, a large adjustable wrench ( Install base nut) And a small adjustable wrench ( Full install other nut) , a flat head screwdriver, a triangle lock tools, a cross screwdriver, and a long nose pliers, an insulating tape, a waterproof tape etc. In addition, also equipped with lifting equipment and lifting equipment. ( 3) According to the shipping list check lamps and lanterns; With reference to the packing list one by one to check all parts for knock against, wear, deformation, scratches and other damage, stop device and the unqualified products. When light pole placement component and the wear of attachments ( Such as solar energy battery components and a light) , it is necessary to use soft mat mat live them, in order to avoid unnecessary damage is found in the process of devices, such as scratches, etc. When placed under the light pole component, with the top of the light pole under the component needs to be supported by the hob, facilitate the lampposts components of the device. ( 4) Check the solar modules and wind generator nameplate, inspection standard, model and quantity is in accordance with the requirements. Do not conform to the requirements, should be replaced immediately, not far-fetched. ( 5) Check whether the solar modules and wind turbines is damage or scratches, if any should be replaced immediately. ( 6) Check the solar battery components are negative tag, to ensure correct is negative connection. Use multimeter to verify them, prevent malfunction and other phenomena. Authentication methods: use a digital multimeter red and black probe contact solar battery components of two electrodes, respectively. If it comes as the red probe to the corresponding electricity is positive, if negative, the red probe to owe the government's debt electrode. Other ways to detect fraudulent debt is the same.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service