( 1) Disassembling and assembling address selection. Disassembling address should be installed in the nearby, so that the assembly after the delivery. In addition, the device address covered by rain wear, avoid the bump on the ground or fine sand and dirt and wear and tear of lamps and lanterns and defiled, etc. ( 2) Plant personnel

( 1) Disassembly and assembly address selection. Disassembly and assembly address should be and neighbouring device address, so that the assembly after the transportation. In addition, the device address covered with rain wear, in order to avoid the bump on the ground or fine sand and dirt and stains caused by light wear and scratches and stains. ( 2) Installation personnel and goods. There are 3 - Six professional installation personnel ( Installation tasks can increase when heavy installation personnel) 。 Each equipped with a set of equipment, including a multimeter, a large adjustable wrench ( Install base nut) And a small adjustable wrench ( Full install other nut) , a flat head screwdriver, a triangle lock tools, a cross screwdriver, and a long nose pliers, an insulating tape, a waterproof tape etc. In addition, also equipped with lifting equipment and lifting equipment. ( 3) According to the shipping list check lamps and lanterns; With reference to the packing list one by one to check all parts for knock against, wear, deformation, scratches and other damage, stop device and the unqualified products. When light pole placement component and the wear of attachments ( Such as solar energy battery components and a light) , it is necessary to use soft mat mat live them, in order to avoid unnecessary damage is found in the process of devices, such as scratches, etc. When placed under the light pole component, with the top of the light pole under the component needs to be supported by the hob, facilitate the lampposts components of the device. ( 4) Check the solar modules and wind generator nameplate, inspection standard, model and quantity is in accordance with the requirements. Do not conform to the requirements, should be replaced immediately, not far-fetched. ( 5) Check whether the solar modules and wind turbines is damage or scratches, if any should be replaced immediately. ( 6) Check the solar battery components are negative tag, to ensure correct is negative connection. Use multimeter to verify them, prevent malfunction and other phenomena. Authentication methods: use a digital multimeter red and black probe contact solar battery components of two electrodes, respectively. If it comes as the red probe to the corresponding electricity is positive, if negative, the red probe to owe the government's debt electrode. Other ways to detect fraudulent debt is the same.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
CCTV Authority Spotlight: Alltop's Innovative Energy Storage Products Shine at Canton Fair

CCTV featured Alltop's innovative energy storage products at the Canton Fair, highlighting the company's technological strength and market leadership. The brand drew significant attention and orders at the event, with its booth attracting global visitors and showcasing advanced renewable energy solutions. The coverage underscored Alltop's expertise in energy storage systems and smart solar lighting, earning national recognition for its innovation.
Invitation | From October 15th to 19th, ALLTOP invites you to attend the 138th Canton Fair together!

The 138th China Import and Export Fair

Date: Oct. 15th-19th, 2025

Booth No.:14.3F33-34G10-11

Add: China Import and Export Fair Complex (Canton Fair Complex)
Global Witness, Technological Breakthrough! ALLTOP Showcases Comprehensive Solutions at Solar PV & Energy Storage World Expo

Solar PV & Energy Storage World Expo

The 17th Guangzhou Intl Solar Photovoltaic & Energy Storage Exhibition

th No.:10.2 B551

Date: 8th-10th, August 2025

ADD: Area B, China Import & Export Fair Complex, Guangzhou
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect