loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

How to eliminate high lamp failure?1

Remind you how to troubleshoot? High lamp manufacturer to introduce to you, the main content is as follows:

1, poor quality of light, engineering construction,

because construction quality caused by the fault for a larger proportion. Main performance: one is the depth of the cable trench is not enough, sanding cover brick construction according to the standard; 2 it is aisle pipe production and installation does not conform to the requirements of both ends not made syndromes according to the standard beep mouth; Three is cable when the shop is dragging on the ground; Four is not in accordance with the requirements of standard construction is the foundation of embedded pipe, refined classification is mainly embedded pipe, coupled with a certain amount, difficult in cable, in appears at the bottom of the base & other; Die bending & throughout; Situation; Five is the line nose and the thickness of insulation wrapped pressure is not enough, after a long run would interphase short circuit.

2, material don't pass the

it from years of treatment failure, material quality is low and there is a big factor. Main show is: less wire containing aluminum, lead is hard, thin insulating layer. This situation is more common in recent years.

high lamp manufacturers to remind you how to troubleshoot?

3, form a complete set of engineering quality is not high,

high lamp cable generally spread on the sidewalk. The pavement construction quality is poor, ground subsidence, the cable force deformation, cable sheathing. Especially in the alpine zone in northeast China, the winter arrival, make the cable and soil to form a whole, the ground once appear, settlement, will be a tear at the bottom of the garden lamp base, and by the summer rain, will burn out in basic root.

4, unreasonable design on one hand,

is the overload operation. With the continuous development of city construction, coupled with advertising career developing rapidly in recent years, the advertising of load are also relevant in high lamp, make the light load is too large, cable line nose overheating, heat, insulation, a grounding short circuit, and so on and so forth; Is on the other hand, when light pole design only consider oneself circumstance of light pole, ignore the cable head space, cable head wrapped good later, most are even doesn't close the door, sometimes the cable length is not enough, joint production does not conform to the requirements, the causes of failure.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service