loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

How much money 20 w solar street light

7, solar street light vertical line to fasten, tidy and suitable for broken skin dew bare wire should be replaced,, and meet the household vertical line and the line in the biggest swing, distance of not less than 50 mm, there are vertical lines to connect power jump line in the construction, maintenance, need pliers with tight; 9, the solar street light

solar lamp is a can be used for urban street community and ecological park lighting lamps and lanterns, also could be used in the population structure of relative density is small, the traffic is not convenient and economy more developed, unable to use conventional energy areas of electricity, so when installing solar lamp stand what skin line operation process have, below is follow solar lamp manufacturers together to learn about the solar street lamps:

1 to choose insulating layer of the skin, make skin line line, if it is a copper core can not be lower than 1. 37 mm, while if it is aluminum core can not be lower than 1. 76mm;

2, make skin line symmetry reinforced lap when picking up empty frame transmission line on either side of the pole, reinforced by it from 400 - bar management center 600 mm, both sides must agree, it is a vertical line plug wire side;

3, solar lamp stand leather line if more than four metres long, middle must add support fixed, choose not less than 7/1. 0 insulating layer stranded, and the application of a single cross tie tied;

4, when the trunk line and made of different metal materials, using the two color of tie line as a cohesive connection head as leakage line, the leakage line up to not more than 100 mm, the other lines to make skin should be tied up in insulation support do come back, can't use this line in coiling, and in the power plug out on galvanized pipe or gray bar hole need to add a plastic hose, pipe diameter not less than 200 mm;

5, vertical line segment suspension can have a connection, the maximum number of connections to wrap around 5 - on each side 7 laps and package tape, not the same as the standard connection head can not carry out connection, and wear into galvanized tube and rod hole inside the power plug, you can't have connection, additional vertical line can not from power lines across;

6, spacing of high pressure wire close to change line length, 7/1. 0 insulating layer stranded, with its main thru a back button should be the other binding wire coiling 30 ~ 50 mm;

7, solar lamp stand to fasten, neat suits, leather broken Lou bare wire should be moved around, and there are also vertical line meet the household with the line in a large rock, distance can not be less than 50 mm, there are also vertical line plug wire line leakage in engineering construction, maintenance, with a long nose pliers with tight;

8, electric power capacitor, electronic ballast, the screw thread, can press 2 line knot, the maximum number of lines and bending bearing should be clockwise and flat washer card tight;

9, in solar energy lamp stand line of zero line of the zero line do not meet the household with the customer line together, avoid zero leakage source a zero line broken, from the customer table in the switching power supply.

above is solar energy lamp stand leather line operation process, if there are all uncertain can telephone contact with my factory, my enterprise is specializing in the production of manufacturing solar energy lamp manufacturers, quality and cheap price, welcome phone call.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service