loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

How much does it cost to install solar street lamps in the countryside

1, according to the actual job site lighting needs, rural solar street lamps manufacturer to determine the installation position of lamps and ballasts and way, and then according to the lamps and lanterns to the ballast contact distance and ballast to contact distance 220 v power supply to prepare the corresponding length of three core cable

1. According to the actual job site lighting needs, rural solar street lamp manufacturers should determine the installation position of lamps and lanterns and ballast and way, and then according to the lamps and lanterns to ballast contact distance and ballast to contact distance 220 v power supply, prepare the corresponding three core cable length ( Equipped with the cable can use of lamps and lanterns, if the distance is not more than 2 m) 。 2. When the distance between the lamp and ballast contact more than 2 m, 3 core cable should be replaced. That is to say, with Allen wrench unscrew the lamp shell six hex bolts, pull the lamp body parts, remove the lamp provides three core cable, and then according to the original wiring method three core cable connection prepared. 3. With a socket wrench unscrew ballast lifted the lid on the bolt, for the price of solar panels, take off the lid, the light at the end of the three core cable through the introduction of the ballast output port device introduced ballast cavity, the red line, black line ( Or the blue one) And yellow line respectively connected to the 4, 5, and 6 terminals of the ballast, then tighten the gland nut. 4. Preparation will be a good one end of the three core power cable through the introduction of the ballast input port device introduced ballast cavity, then L line ( Wire) , N line ( The zero line) And ground wire is connected to the ballast respectively 1, 2, 3, the location of the terminal blocks, tighten gland nut. 5. Close ballast box cover and tighten the bolt. Finally, according to the requirements of explosion-proof, connect the other end of the three core cable to 220 v power supply, price for solar panels. 6. Replacement bulbs, the first cut off power supply, check whether the chain hoist is hanging right, then turn the chimney by Allen wrench on the six hex bolts, carefully pull the lamp body, separate the light from the lamp cover body, unscrew the old bulb, change into new bulbs. ( : the above content will be classified according to the price of solar street light release to you]

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service