Dug a pit is dug the pit of embedded parts, general 6 meters of solar street lamps have dug a pit depth in 1 m, width of 40 cm long, in general, a pit of working hours in 025 days, one of the workers a day 4 - Five hole, specific see the local soil conditions. According to the light pole big tree lamp
how long does it take to install a solar street light?
q: how long does it take to install a solar street light?
a: install solar street light is divided into several processes, about to experience a few days before and after process the following:
1, dug
refers to dig up the hole he dug the general 6 meters deep dug up and down in the 1 m solar street lamps, a total of 40 cm wide, general conditions, a pit of comprehensive working hours at 0. 25 days, a worker dig 4 - one day Five pit, and the actual local soil types.
2, concrete pouring,
pit digging, you need to up concrete pouring in, with the above models of C20 concrete for concrete pouring, the concrete cases should be pay attention to the upper and lower levels shall, in addition to maintaining good teeth.
3, maintenance
after concrete pouring, must be a week of maintenance period, this period is the best don't have to shake up, without pressing, pour out the second day can carry out maintenance, if it is freezing period, also must be solved in the cold.
4, assemble
will assemble good solar street lamps, each must be fixed in the part of the street lamps fixed well, the battery box buried underground, cable to the threading pipe.
5, tree lights
tree lights according to the size of the street lamp, solar power generation solar panels, net weight, the vertical of the effective methods, to be able to choose a crane or is artificial service shaft rod.
6, wiring
stem, LED street light, we must carry out the wiring, also is the end of the street lamp installation step.
in general, solar street lights a lamp can't calculate time, generally speaking, the total number of solar street lamps installed in one hundred and more common, with analysis of characteristics of one hundred people, if use five people to carry out the installation, apart from the maintenance period, a total of around must be the time of the following:
1, dug
3 days up and down
2, concrete pouring: 2 days up and down
3, assembled: 2 days up and down
4, stem and wiring: five days up and down
total is 12 days, in other words, one hundred solar street lamp, five people have to 12 days can do, a total of 60 comprehensive working hours.
each install solar street light is around 2 light not on.
thus, people can also be speculated that a solar street lamps must be artificial service costs about how much money.