The reasonable construction of solar LED street light foundation and material selection of the correct in the whole process of the installation of lamps and lanterns has the effect that cannot ignore. Designers in the design of a solar LED street lamp installation layout before, must be conducted to install to surroundings careful investigation
solar LED street lamp base in the proper selection of reasonable construction and materials in the lamps and lanterns of the plays an important role in the installation process. Somewhere in the design of solar led street lamp installation layout before, designers must carefully check installation site surrounding environment, so as not to cause the unreasonable installation site. The first is to choose the principle of solar led street light installation location: ensure catchment is smooth around. If 10 meters river and the puddle worldwide, river and pool water based surface must be less than 2 meters. No obstacles around ( According to the installation height of lamps and lanterns) And high tension line and other dangerous goods. No cable, optical cable, drainage pipe installation site of public facilities (such as Special cases need to coordinate in advance) Installation of solar led street lamp note: depending on the installation site, installation personnel have a responsibility to choose a location for the installation of the unreasonable question, stop the installation, and those responsible report within the first time. Before installation, ready to make solar led street lamp base necessary tool, choose to have the installation personnel installation experience. In strict accordance with the figure, the basis of solar led street lamp to choose the appropriate cement, at high soil ph choose the special cement resistance to acid and alkali. Fine sand and gravel shall not contain soil and other impurities that affect the concrete strength; Along the road excavation pit in strict accordance with the size of the solar led street lamp base figure ( Installation size determined by installation personnel) 。 After the completion of the foundation pit excavation, placed 1 ~ 2 days, if there is a groundwater seepage observation. If there is leakage of groundwater, immediately stop installation progress; 5 times must be added to the battery, at the bottom of battery box on the base. ф 80 drain or according to your drawings. Basis, buried on the cage of the surface must be level ( Use level measuring and testing) To the cage, anchor bolt must be perpendicular to the base surface ( With square measuring and testing) ; Before installation, threading pipe ends must be blocked to prevent foreign matter to enter or during or after installing a blockage, which causes the difficulty in installation process thread or thread. The foundation must surrounding soil compaction. Solar led street lamp base should keep 2 ~ 7 days after completion of the foundation ( Depending on the weather) 。 Solar led street lamp installation must be based on solar led street light after passing the acceptance test. YWX promote high quality quick push children's clothes, 18013196696]