loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

High lamp maintenance keep lamps factory specific deadline requirements

High lamp maintenance maintenance is time limits, the following follow high lamp manufacturers look at together. High lamp facilities intact rate shall be 90% above, if you find the lamps and lanterns of high lamp parts damaged or received within four hours after the repair of lamps and lanterns, to complete the damage



high lamp maintenance maintenance is time limits, the following look at together with high lamp manufacturer.

high lamp facilities pipe should reach more than 90%, if it is found that light, the lamps and lanterns of partial damage or received within four hours after the repair of lamps and lanterns, to complete the make-up and replace damaged lamps and lanterns, in addition to the replacement of lamps and lanterns, the general failure of high lamp lighting facilities shall be within 24 hours to repair; Serious failure in addition to the force majeure reasons, should be within 3 working days to repair.

the work of cleaning the light, at least for once a year, functional testing should be from the light, lamps and lanterns began three months before the normal life, but to do not accord with standard of safe distance influence the lighting effect of the trees, by the city road lighting management institutions and landscaping pruning after consultation, the administrative department to make sure that light, normal light.

high lamp maintenance maintenance and specific time requirements in

high lamp maintenance shall strictly abide by the safety more than rules of solar energy street lamp manufacturers, operation field must be set up safety guardian, maintenance and repair work should reduce the interference and influence on traffic, as far as possible to avoid the rush hour, affect traffic should traffic by designated persons.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service