3) high lamp for installation, basic work can at the same time must be ready for some concrete and put all of these basic things in to the base of the pit, use level to ensure that the inside of the foundation pit horizontal position, thereby effectively in the process of high lamp installation, also can to ensure the normal use, so to do related inspection after the installation is complete.