Preface
the appendix A of this international standard, appendix B, appendix C and appendix D for normative appendix, appendix E for informative appendices.
this standard put forward by China light industry federation.
this standard by the national lighting lamps and lanterns of standardization technical committee branch ( SAC/TC 224/SC 2) The focal points.
this standard main drafting unit: national center for quality supervision and inspection of lamps and lanterns, philips lamps and lanterns, Shanghai) Co. , LTD. , hangzhou zhejiang university three-color instrument co. , LTD. , national electric light source quality supervision and inspection center ( Shanghai) , Shanghai times lighting electrical detection co. , LTD. , zhejiang sunshine group co. , LTD. , guangdong heshan silver rain lighting co. , LTD. , warom group co. , LTD.
main drafter of this standard: SangGaoYuan, Chen, Sue, seeks to rise, sisia shi, Han Bing, with flat, Chen yong, TaoJiu cheung, He Jintian.
1 scope this standard specifies the use of the power supply power less than 1000 v of gas discharge lamp and LED light source, road and street lighting lamps and lanterns, Hereinafter referred to as the lamps and lanterns) The performance requirements.
road and street lighting lamps and lanterns is urban road and the street was the use of places.
is the purpose of these standards are formulated to guide the design of the road and street lighting lamps and lanterns, the production and use of the road and street lighting in the premise of meet the safety requirements of lamps and lanterns, to achieve a road and street illumination intensity, the electric performance and mechanical performance and energy efficiency requirements.
this standard does not cover the tunnel lighting lamps and lanterns.
2 normative reference files of the following documents the terms through reference of this standard, the provisions of this standard. Every note date reference documents, its all subsequent modification single ( Not including errata content) Or revised edition are not applicable to this standard, however, according to the agreement of the parties of this standard are encouraged to study whether can use the latest version of these documents. Anyone who doesn't note date reference documents, the latest version is applicable to this standard.
GB7000。 Lamps and lanterns of 1 part 1: general requirements and test ( GB7000。 1 - 2007年,IEC60598 - 声学,IDT) GB7000。 5 road and street lighting lamps and lanterns of security requirements ( GB7000。 5 - 2005年,IEC60598 - 2 - 3:2002 (IDT) GB/T 9468 distribution of lamps and lanterns photometric the general requirements of GB/T 13259 high pressure sodium lamp ( GB / T 13259 - 2005、IEC 60662:2002 NEQ) GB/T 14044 ballasts for tubular fluorescent lamps with performance requirements, GB / T 14044 - 2005、IEC 60921:1994 MOD) GB/T 15042 light discharge (in an attachment Except for tubular fluorescent lamps) With the performance requirements of the ballast ( GB / T 15042 - 2005、IEC 60293:2001 IDT) GB/T 15144 tubular fluorescent lamps with ac electronic ballast performance requirements ( GB / T 15144 - 2005、IEC 60929:2002 IDT) Details content, please click to download to watch: http://bbs. lightingchina。 com/dispbbs_18_18860. 超文本标记语言