Garden lamp installation and construction method

1. Installation and construction method of courtyard lights

u003cbru003e

u003cbru003e 1. Measurement stakeout: Strictly locate the location according to the markings in the construction drawings, and use the level to stake out according to the reference points and reference elevations delivered by the resident supervision engineer, and submit the resident supervision engineer for inspection.

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e 2. Foundation pit excavation: excavate the foundation pit in strict accordance with the design requirements of the elevation and geometric dimensions. After the excavation, the foundation should be cleaned and the foundation should be compacted.

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e 3. Foundation pouring: The street lamp foundation is related to the strength and stability of the sign, which is the focus of this project. For this purpose, it must:

u003cbru003e

u003cbru003e

u003cbru003e (1) In strict accordance with the material specifications specified in the design drawings and the rolling method specified in the technical specifications, the foundation steel bars are rolled and installed, and verified by the resident supervision engineer.

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e (2) The foundation embedded parts should be hot-dip galvanized.

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e (3) Concrete pouring must be in strict accordance with the material ratio and fully stirred evenly, pouring in horizontal layers, and the thickness of vibrating tamping shall not exceed 45cm to prevent separation between the two layers.

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e

u003cbru003e(4) The concrete is poured in two times. The first time is about 20cm above the anchor plate. After the initial solidification of the concrete, the scum is removed, the embedded bolts are accurately corrected, and the remaining part of the concrete is poured. And to ensure that the installation level error of the foundation flange is not more than 1%.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service