loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

For high lamp, to use and install the lamp, it is very common

High lamp production found that 20 meters high lamp usage is very common, such as city square, municipal parks, school, stadium, highway toll station, etc. , high lamp with light pole height is generally above 15 meters, lamp holder power above 150 w, and so on characteristics, make the light body hair

high lamp manufacturers, found that use 20 meters high lamp is very common, such as city square, municipal park, school, stadium, highway toll station, etc. Light, generally more than 15 meters high, lamp holder power 150 w, etc. This makes the lamp body glow covering area is larger, more luminous intensity, which is accepted by the market. We produce and use most of the light, to a height of more than 15 m, this is the difference between the light and light in. High lamp manufacturers is usually more than 12 m light pole design into two pole for Mosaic. One reason is that the rod body is too long to transport. Another reason is that, if the light is too long, the total length of the light pole will inevitably need a large bending machine. If there is a traffic light to run in this way, a high lamp manufacturing costs will be very high. In addition, the longer the light, the lamp body, the easier it is to be out of shape.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service