loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Essential for flood control and disaster relief [SFW6220] Flood control omnidirectional automatic floodlight work light

Essential for flood control and disaster relief [SFW] flood control all-round automatic floodlight work light

The Z-SFW portable lifting work light developed and produced by our company is designed to meet the needs of large-area high-brightness lighting for various large-scale construction operations, accident repairs, emergency rescue and disaster relief work sites such as railways, electric power, and public security.

Technical parameters of SFW flood prevention omnidirectional automatic floodlight work lampCharging voltage ACV; rated voltage V; rated capacity AH; light source life H; working time greater than H; charging time less than H; battery life cycles; overall dimensions** mm; lifting height.-.m; weight kg; protection class IP.

. Lamp holder function: The lamp panel is composed of w LED lamp holders. Each lamp holder can be individually adjusted to rotate at a large angle up and down, left and right according to the needs of the scene, and the lamp holder can also be illuminated in the same direction or two different directions; the whole Illumination takes into account both near and far, with a large range, high brightness and long bulb life.

Lighting time: When the battery is used for power supply, a full charge can continuously illuminate for more than hours: the use of v city power can achieve long-term continuous lighting.

.The lamp is composed of the upper and lower parts of the lamp holder (including the lamp panel, the telescopic gas pole) and the battery holder (including the battery pack, the electrical box, and the charger). It is light and easy to assemble, disassemble, easy to operate, and easy to use.

. Adaptation place: The whole is made of high-quality imported metal materials, with compact structure and stable performance, ensuring normal operation in various harsh environments and climatic conditions, rainproof, water spray, and wind resistance.

.Customized for you: In order to meet the individual needs of users, if the standard configuration of this product cannot meet the needs of users, our company can adjust the number of lamp holders, power, flooding or concentrating, and telescopic cylinder rise The lifting height and the equipment of the generator are adjusted according to user requirements.

Check whether the power indicator light has electricity before use, and it can be used normally when the power indicator light is above the grid.

Install the lifting rod, insert the lifting rod into the light pole sleeve of the electrical box, and tighten it with manual bolts.

Fix the lamp panel, put the low end of the lamp panel on the top of the lamp pole, tighten it with manual bolts, and insert the aviation plug of the lamp head into the aviation socket on the electrical box.

Turn on the control switch on the electrical box respectively, pull it up to turn on, pull it down to turn off, and control the two lights separately.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service