Do you know how to prevent the solar photovoltaic power station in the rain?

Summer rain, torrential rain affect plant mainly comes from the rain soak on panels and electrical components. For family distributed photovoltaic power station, the drainage ability of inclined housetop itself, it is difficult to signs of product water, heavy rain shadow

summer rainstorm is frequent, heavy rains influence on plant mainly comes from the rain soaked panels and electrical components. For households with distributed photovoltaic power station, the drainage of inclined housetop itself has a strong ability, it is difficult to have too much water, the influence of the heavy rain is negligible. Really affected is flat roof. When rainfall is too large, the panels may be rain soaked, because of the flat roof bracket installation is relatively low. Ordinary families roof has good drainage function, it is a basic requirement of the building. Cement flat roof drainage ability weaker than sloping roofs, but under normal circumstances, flat roof drainage without too much water can be effectively. In order to prevent too flat roof water and form a small pond, and can increase a set before the storm drainage system, effective drainage. As long as not too much water, the impact on the panels will be minimal. How to deal with heavy rain risk? The design, must fully consider the fixed load of the roof. If power station built on flat ground, geographical and geological factors should be considered, such as the location for the selected terrain, slope degree of volatility and potential geological disaster, water depth, flood, drainage condition, etc. In addition, the equipment selection are also important, such as photovoltaic power station equipment components, inverter, support, etc. At present, the most effective way is to increase the drainage system scientifically. In addition, after the storm, when close to or contact photovoltaic inverter and solar panel and power supply cable connections between parts, electric shock could occur, was damaged by the flood of solar panels may appear and poor insulation failure, resulting in shock hazard. In the process of recovery operation, should avoid unarmed operations and adopt measures to prevent electric shock, Use rubber gloves and rubber boots, etc. ) 。 ) To reduce the risk of electric shock.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
ALLTOP presents innovative products at the 2024 Solar PV and Energy Storage World Expo
2024 Solar PV & Energy Storage World Expo The 16th Guangzhou Intt Solar Photovoltaic & Energy Storage Exhibition Booth No.Booth B551, Hall 10.2, Area B TIME/August 8th-10th, 2024 ADD: Area B, China Import & Export Fair Complex, Guangzhou
Pv + Agriculture: ALLTOP lights up Pakistani farms with green light, photovoltaic agricultural irrigation project is successful
While actively responding to the "Belt and Road" Initiative, ALLTOP should dig deep into overseas markets and carry out accurate market positioning and strategic planning. Comply with the current economic trend in the international situation, while ensuring that its products and services can meet the actual needs of countries along the "Belt and Road", and make ALLTOP unique products can achieve the purpose of truly serving the "Belt and Road", so as to achieve a soft landing and grounding; A pr
Shaping the Future of Energy ALLTOP at the Expo Georgia Exhibition Center
Live up to the old expectations! On April 26,The 28th International Exhibition for Buildi had its grand opening. ALLTOP team appeared in 118A, Hall 11.36, brought many new photovoltaic products, outdoor street lights, photovoltaic energy storage and other one-stop systematic solutions, attracted more than 300 industry leading enterprises to participate in the exhibition, many visitors have stopped to visit, exchange, tens of thousands of visitors, customers together, a glimpse of the annual indu
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect