loading

We are a leading manufacturer of solar power utilization and lighting systems

Detailed installation solar street lamp intelligent solar street light system design flow

A, foundation pouring 1, determine the floorlamp position; Survey and geological conditions, if the surface of the 1 m 2 are all a hotchpotch of soft soil, the excavation depth should be deepened; At the same time to confirm the excavation position under no other facilities ( Such as cable, pipes, etc. ) , street lamp at the top of the not long time

a, 1, determine the position of the vertical light base casting; According to the geological survey, if the surface is 1. 2 meters of soft soil, the excavation depth should be deepened. At the same time, we should confirm no other facilities ( Such as cables and pipelines, etc. ) Under excavation, and no long street lamp at the top of the sun shade, otherwise, should be appropriate to change position. 2, reserved at the location of the vertical lamps and lanterns, The excavation) The pit of conform to the standard ( According to the height of the light pole design depth) ; Should be embedded parts of positioning and casting. Embedded parts are placed in the center of the square hole, one end of the PVC pipes placed in the middle of the embedded parts, the other end is placed in the place of battery. Keep the embedded parts and foundation and the ground at the same horizontal plane ( Or screw at the top and the original ground in the same horizontal plane, depending on the field need) On one side, should be parallel to the road; Only in this way, light can be upright and not skewed. And then pouring concrete C20 and fixed, casting shall not stop vibrating plate, to ensure the high dense. 3. After completion of construction, clear in time positioning plate of residual sludge, and waste oil clean up the impurity on the bolt, Bolt location with tape before construction, prevent excessive magazine clinging, affect the installation progress) 。 4, concrete during solidification, and often to water conservation; Droplight can only be installed in concrete after complete solidification ( Usually more than 72 hours) 。 Second, the installation of lamps and lanterns. Fixed components parts: will the sun plate fixed on the bracket of solar panels, lamp holder will be fixed in the arm, then stent and picking arm fixed on the main stem, the connector to control box ( A battery pack) 。 2. Lamp before ascension, check whether the parts fasteners, lamp holder installed correctly, the light source is working correctly. Then, simple debugging system is working correctly; Loosen the controller of solar panels on the cable, light work; Connect the solar panels cable and turn off the lights. At the same time, carefully observe the controller light changes. Only when everything is all right, it can be filed and installation. 3. Improve the main light pole pay attention to safety measures. Fully tighten the screw. If the component in the deviation Angle of sunrise, it is necessary to adjust its facing south direction of sunrise. 4. Put battery into the battery box, according to the technical requirements will be connected to the controller. First connect the battery, and then connect the load, and then connect the solar panels. During the connection operation, must pay attention to the controller of all wiring and terminals can't tag on wrong connection, positive and negative polarity not conflict or reverse connection. Otherwise, the controller will be damaged. 5, debugging, system working properly; Loosen the controller of solar panels on the wire, the light will light up. At the same time, connecting solar panels cable and turn off the lights. Look carefully on the controller lights change. Only when everything is normal, the control box can be sealed. 3. The installation of cell 1. Put in the tank, as when the battery must be handled with care, to prevent the damage of water tank. 2. Output line is connected to the battery, after short circuit is prohibited in any case, in order to avoid damage to the battery; 3. On the output of the battery and pole controller connection, must through the PVC threading tube; 4, after the completion of the above, check the controller end connection, prevent short circuit. After normal operation, the door is closed control. Fourth, solar energy battery components to install

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
ALLTOP presents innovative products at the 2024 Solar PV and Energy Storage World Expo
2024 Solar PV & Energy Storage World Expo The 16th Guangzhou Intt Solar Photovoltaic & Energy Storage Exhibition Booth No.Booth B551, Hall 10.2, Area B TIME/August 8th-10th, 2024 ADD: Area B, China Import & Export Fair Complex, Guangzhou
Pv + Agriculture: ALLTOP lights up Pakistani farms with green light, photovoltaic agricultural irrigation project is successful
While actively responding to the "Belt and Road" Initiative, ALLTOP should dig deep into overseas markets and carry out accurate market positioning and strategic planning. Comply with the current economic trend in the international situation, while ensuring that its products and services can meet the actual needs of countries along the "Belt and Road", and make ALLTOP unique products can achieve the purpose of truly serving the "Belt and Road", so as to achieve a soft landing and grounding; A pr
Shaping the Future of Energy ALLTOP at the Expo Georgia Exhibition Center
Live up to the old expectations! On April 26,The 28th International Exhibition for Buildi had its grand opening. ALLTOP team appeared in 118A, Hall 11.36, brought many new photovoltaic products, outdoor street lights, photovoltaic energy storage and other one-stop systematic solutions, attracted more than 300 industry leading enterprises to participate in the exhibition, many visitors have stopped to visit, exchange, tens of thousands of visitors, customers together, a glimpse of the annual indu
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect