loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Dali: solar street lamps should be taken when installing solar garden light

Garden light is a set of independent from the power supply system, when installing a solar energy and maintenance-free battery, when placed on control box must be light to take light put, prevent broken control box; Battery cables must be bolted to the pressure between the battery terminal, and the use of copper

the courtyard lamp is an independent power supply system. Maintenance-free storage battery, solar installation on the control box must be handled with care, in case of damage control box. Battery cables must be bolted to the pressure between the battery terminal, and use copper gaskets to improve its conductivity. Output line is connected to the battery, after short circuit is prohibited in any case, in order to avoid damage to the battery. When the battery output line is connected to the pole in the controller, it must be through the PVC pipes. After completing the above steps, check wiring terminal controller, prevent short circuit, the door is closed during normal operation control. Solar garden light every component parts of the installation requirements of fixed: solar panels on the solar panel bracket, lamp holder on the pick arm, then stent and pick arm fixed on the main stem, connecting to control box ( A battery pack) 。 Lamp before ascension, check whether the parts fasteners, lamp holder installed correctly, the light source is working correctly. Then, when debugging system work normal or abnormal, loosen the controller and solar panels on the cable, light work, with solar panels and connected lamp close; At the same time, look carefully the controller light changes, the data to normal before the lifting and installation. Improve the main light pole, pay attention to safety precautions. Tighten screw must be correct. If the component on the sun Angle deviation, it is necessary to adjust its facing south direction of sunrise. Put battery into the battery box, according to the technical requirements will be connected to the controller, connect the battery first, then connect load, then connect the solar panels; In the process of wiring operation, it is important to note that the controller of all wiring and tag on terminal blocks cannot be connected in the wrong way, positive and negative polarity not conflict, connection cannot be reversed, otherwise it will damage the controller. Debug the system whether can normal running again; Loosen the controller on the solar panel cables, solar garden light light light, connect the solar panel cables, and turn off the lights; At the same time, observe the controller on the change of the light, so that data is normal before sealing control box.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service