Here is China's 11th five-year plan: technology category planning objectives ( Kilowatts) 1 in the key areas. Small photovoltaic 10 Tibet, gansu, Inner Mongolia, ningxia, xinjiang, urban roof system and large iconic 5 in Beijing, Shanghai, guangdong, jiangsu
the following is one of China's 11th five-year plan:
categories
planning objectives ( Kilowatts)
key areas
1. Small photovoltaic
10
Tibet, gansu, Inner Mongolia, ningxia, xinjiang,
urban roof system and large iconic
5
in Beijing, Shanghai, guangdong, guangdong, guangdong
photovoltaic large power station
5
the stone forest, Lhasa, dunhuang and ordos
2. Remote area power supply
15
Tibet, qinghai, gansu, xinjiang, yunnan, sichuan
3. Solar thermal
5
in Inner Mongolia,
total
300000 kw
to all of the 2010 Chinese solar power a total of only 300000 kilowatts. Less than 2008 solar panels are one of the six copies. Development and reform commission (NDRC) is put forward in 2020, only 1. 8 million kw solar power generation, also haven't reached the amount of annual production of 2008 solar panels.
why is this case? Obviously this is not because China's backward in technology, its basic reason is: import and export, completely is the law of market economy in the dominant, has this aspect demand abroad, there is a market, so they can export, while at home is completely controlled by the planned economy, LED street lamp, countries don't order, there is no market. This is the crux of the solar power generation business in China fall behind.