In the process, of course, be sure to get the foundation solid, and then to the next step of work, otherwise later will be a lot of trouble, if you want to know more details of the solar led street lamp product installation, please call our shandong lighting customer service, welcome you to join. When
although said everyone to solar led street lights are all relatively identity, but its installation index to be relatively high, before installation, the roadbed is critical, immediately associated with is it can show the safety of lighting lamps and lanterns. For solar led street light, for its part, how shall we play the roadbed, lighting lamps and lanterns today network guys summary of summary.
1, to ensure that the floor area, you must first research the local standard of geology, because for solar street light, it's work time is relatively long, want to ensure that its use of time is relatively long, can not be lack of this work. If the surface of 1 m 2 is soft soil big miscellaneous, deep foundation pit excavation should be aggravating, the unearthed cultural relics sites at the same time, ensure that no other some equipment, such as cable, pipeline, such as street lamps installed in a period of time as far as possible not at the top of the content blocks of shadow, or you must change the installation address.
2, in such cases, lighting lamps and lanterns ( 1 cubic meters pit excavation embedded within the rules, and built-in parts and forging and built-in placed right in the middle of the pit on the city square, PVC wire and tube end up properly. Right in the middle, at the other end of the battery. Maintain insert, roadbed and road surface in the same level surface ( Or extruder screw and at the same level on the surface of the top of the original roadbed site as required) Side should be parallel surface on the road; It can ensure that street lamp after appropriate and not tilt up fixed, then to C20 concrete casting, forging or deactivate vibrator vibration in the whole process, to ensure that overall, the relative density and durability.
3, in the later, will immediately remove the rest of the silt and the positioning plate some residual cleaning residue of anchor bolt.
4, concrete condensation process, the water in time to carry out the maintenance, the concrete setting for three days, then began to install solar power led street light.
the lights for the subgrade, it is show lighting lamps and lanterns at all, only to maintain the reliability of it, to the safety of non-motor vehicles maintenance have certain effect. Nature in the whole process, must make roadbed solid, then the next step of work, otherwise later inconvenience to a lot of, if want to master a lot of the detailed content of solar led street light products installed, the warm welcome calls in shandong province lighting lamps and lanterns of online customer service, welcome you to add.