According to the lottery: west to Shanghai hongqiao airport terminal building and attached building indoor lighting engineering

Shanghai hongqiao integrated transportation hub is a high-speed, inter-city railway, maglev, urban rail transit, the long distance bus, public bus, taxi, social vehicles and rail, road, air trinity of very large such as airport, world-class transportation hub. A large number of transit transfer between different modes of transport. Such as: the airport - — Maglev, airport - — Rail, maglev - — Railway, and above all kinds of subway, long distance, bus, taxi, social vehicles, such as 64 possible connection, 56 kinds of transfer mode, deal with nearly 1. 1 million passengers a day, 64000 visitors transfer capacity.

Shanghai hongqiao integrated transportation hub international airport terminal consists of the main building of the terminal, boarding corridor in the west. A total construction area of more than 30 square meters. West hongqiao airport terminal planning goal is to meet in the near future passenger throughput of 21 million passengers, and reserved for the future development to 30 million people. In hongqiao airport expansion project planning, design and construction, always follow the 'energy saving, environmental protection, green, human nature is changed' the concept of sustainable development.

the hongqiao airport terminal 2 integrated design and transportation center, transportation center set up within the two groups of hongqiao and pudong airport ticket counter, provide passengers with the pudong international airport flight remote city check-in terminal functions and rail, road and air transportation hub. Hongqiao airport terminal 2 flight convenient process smoothly. Terminal 2 sets, 80, 47 at the check-in counter, greatly save passengers queue time. In view of the domestic terminal operation characteristics, determines the main ticket counter top type of arrangement scheme, make the terminal net is only 108 meters, the main passengers from the security to the gate as far as walking distance less than 300 meters, maximum limit reduces the passenger walking distance. Terminal 2 has 45, the boarding bridge is terminal 1 3 times, nearly reservation more than 70%, of which 8 slots can be docked at the same time three aircraft mix hybrid bridge site, greatly improving the rate of aircraft on the bridge, use efficiency and flexibility. Set the three transfer within the terminal area, meet the IATA transit time ( The international civil aviation transport association) The shortest connecting domestic transit 45 minutes of time requirements.

Shanghai hongqiao airport west building and ancillary building indoor lighting project won the first prize in fifth terms as prize lighting engineering design units declaration: east China architectural design and research institute co. , LTD. , Beijing however into lighting system engineering co. , LTD.

refers to the end of the corridor

stops hall waiting hall baggage claim hall 1

baggage claim hall 2 command center, east atrium

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service