loading

We are a leading manufacturer of solar power utilization and lighting systems

6 m solar street lamps manufacturer wholesale construction and installation of solar street light

Solar energy lamp installation location should choose around catchment is smooth, if within 10 meters in rivers and pools, rivers and pools of water must be 2 m below the ground surface; No obstructions (around According to the height of the installation of lamps and lanterns) And the high tension line and other dangerous items

the installation position of the solar street lamps should choose the location of the drainage unobstructed. If 10 meters river and the puddle worldwide, river and pool water based surface must be less than 2 meters. No obstacles around ( According to the installation height of lamps and lanterns) And high tension line and other dangerous goods. No installation site of cable, fiber optic cable, drains and other public facilities. According to the situation of the construction site, construction personnel are responsible for the installation location of irrationality question and stop the construction, and report to the relevant person in charge at the first time. Before construction, ready to make solar street lamp base necessary tool, select construction experience of the construction personnel; In strict accordance with the foundation drawing solar street lamps, choosing the appropriate cement. The high soil ph must choose special cement resistance to acid and alkali. Fine sand and gravel shall not contain soil and other impurities that affect the concrete strength; Along the road excavation pit in strict accordance with the size of the solar street light foundation drawing ( The construction size determined by construction personnel) 。 After the completion of the foundation pit excavation, placed 1 ~ 2 days, if there is a groundwater seepage observation. If there is leakage of groundwater, to immediately stop the construction; Battery tank placed on the basis of the bottom of the tank must be increased 5 times; ф 80 drain or according to your drawings. In the foundation, buried in the cage on the surface must be level ( Use level measuring and testing) To the cage, anchor bolt must be perpendicular to the base on the surface. The installation of solar street lamps must be based on the solar street light after passing the acceptance test.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect