Light pole position at digging holes do light pole basis: the company to provide the basis of the corresponding specification lamp embedded drawings to land line qian exploration of underground excavation and its obstacles and underground pipelines, if there are any translation should get out of the way, avoid by all means brutal construction. Foundation pit laid 8 centimeters thick cushion. Based water
light pole position at digging holes do light pole basis: companies to provide the basis of the corresponding specification lamp embedded drawings to land line qian exploration of underground excavation and its obstacles and underground pipeline 【 Underground pipeline is laying in the ground used for conveying liquid, gas or loose solid pipe. 】 Get out of the way, if any should be translation, the brutal construction of avoid by all means. Foundation pit laid 8 centimeters thick cushion. Basis of pouring concrete should concentrate processing production, using a blender mixing evenly, transport to the construction site by car. Cushion on the pouring concrete independent foundation, pouring and vibrating; End of the casting, the embedment anchor bolt [ Mechanical components are installed on the concrete foundation, the bolt of the J shape, one end of the l-shaped embedded in concrete are used. 】 Shall, at the anchor bolt secondary net pulp. Pay attention to the light pole foundation bolt protection measures, to prevent injury to the bolt. The embedded threading pipe' Threading pipe full name 'building electrical insulation sleeve'. 】 ( Protecting tube) , should be timely by designated personnel in basic outlet hole hole on the battery, the port should be situated in the middle of embedded parts and embedded parts 5 cm higher than concrete ( In order to avoid water) , try to avoid embedded threading tube bending, the inside diameter shall not be less than 1 wear steel wire hose diameter. 5 times, if the protection tube bending, shall not be less than 2 times, try to avoid death. Port to keep a little down. Nozzle must adopt plugged up, avoid the sediment in the process of construction and other debris into the tube plug threading pipe. After casting, the embedded parts level adjustment, and the concrete base surface smoothing. Before to install solar street lamps light pole basis from two directions to find good verticality, the perpendicularity of the installation process monitoring, verticality deviation is not more than 5 mm, to ensure the verticality of light pole. To make good foundation must be 2 to 5 days ( According to the construction of environment temperature, by the construction personnel to grasp) , in the process of maintenance, the maintenance of the foundation of the surface is not regular testing to ensure that its levels, if do not conform to the requirements, should be timely repair processing.