loading

We are a leading manufacturer of solar power utilization and lighting systems

350 solar street lamp solar panels specially used for solar street lamps

The role of each part is: 1, solar panels, solar panels is the core part of solar power generation system, also is the most valuable part of the solar system. Its role is to convert the sun's radiation ability of electrical energy, or sent to the battery in the

the function of each part is: 1. Solar panel: solar panel is the core part of solar power generation system, also is the most valuable part of the solar system. Its function is to convert the sun's radiation ability into electrical energy, or store it into the battery, or promote work load. 2. Solar controller: solar controller's function is to control the working state of the whole system, prevent the battery overcharge and over discharge. In difference in temperature big place, qualified controller should also has temperature compensation function. Other additional features, such as light control and time control switch should be the optional features of the controller. 3. Battery: general for maintenance-free lead-acid batteries. Nickel metal hydride batteries, nickel-cadmium batteries or lithium batteries can also be used for small and micro system. Its function is when there is light store electric energy from solar panels, and released when needed. Note: no. 1 of the use of solar panels. Do not install the solar modules in the shade of trees, buildings, etc. Away from fire or flammable materials. The assembly structure should be able to meet the environmental requirements, please select the appropriate materials and anti-corrosion treatment. In order to reliably installed components, if the component fall from height empty place, will cause damage or affect the safety of persons and property. Parts shall not remove, bending or by hard object impact, so as not to step on the parts in. 2. Using a spring washer peace gasket will be fixed on the bracket and lock panel component. Installing solar panels and is the best location of the sun into 30 degrees. According to the site environment and the components supporting structure state, grounding panels components in proper way. 3. Toward panels component has a waterproof plug and mother waterproof plug. Before the electrical connection in series, under the plug should be a component of the positive and negative plug connection of a component. Output circuit should be properly connected to the device. The positive and negative can't short circuit. Make sure there is no gap between connector and insulation. If there is a gap, which sparks or electric shock. 4, often check whether the lifting structure is loose, when necessary, to tighten the parts. Check each wire, ground wire and plug connection shape. 5, often with soft cloth to wipe the surface of the component. If you really need to be replaced in 25 years ( Do not need to change) Components, you must choose the same type and model. Don't touch the cable or connector activities section. If necessary, use the appropriate safety equipment ( Insulated tools or gloves, etc. ) 。 6. Repair parts, please use the opaque objects or materials covered parts of the surface of the former, because the parts in the sun will produce high voltage, this is very dangerous. The warranty period of quality guarantee quality photovoltaic modules for 20 years. Power attenuation should not exceed 10% in 10 years, shall not exceed 20% in 20 years. In order to give full play to your panel, please in front of the sun 12 o 'clock, make the panel form a 45 degree Angle with the ground. Don't put the solar panels are flat on the ground, not to put it in my room without direct sunlight, because solar panels need sunlight to generate electricity. Product warranty: our products for ultra toughened glass surface, the light transmittance was 97%, on Japan's imports of poly (vinylidene fluoride backboard, aluminum alloy frame using anodic oxidation surface, to ensure product oxidation in 25 years. Company's products provide 10 years process quality assurance ( In addition to artificial damage and natural disasters such as earthquakes and typhoons) Not less than 90% of the initial power, 10 years. The panels are sold are the real thing for the factory, guaranteed the appearance and power, high conversion rate. Please feel free to buy!

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
ALLTOP presents innovative products at the 2024 Solar PV and Energy Storage World Expo
2024 Solar PV & Energy Storage World Expo The 16th Guangzhou Intt Solar Photovoltaic & Energy Storage Exhibition Booth No.Booth B551, Hall 10.2, Area B TIME/August 8th-10th, 2024 ADD: Area B, China Import & Export Fair Complex, Guangzhou
Pv + Agriculture: ALLTOP lights up Pakistani farms with green light, photovoltaic agricultural irrigation project is successful
While actively responding to the "Belt and Road" Initiative, ALLTOP should dig deep into overseas markets and carry out accurate market positioning and strategic planning. Comply with the current economic trend in the international situation, while ensuring that its products and services can meet the actual needs of countries along the "Belt and Road", and make ALLTOP unique products can achieve the purpose of truly serving the "Belt and Road", so as to achieve a soft landing and grounding; A pr
Shaping the Future of Energy ALLTOP at the Expo Georgia Exhibition Center
Live up to the old expectations! On April 26,The 28th International Exhibition for Buildi had its grand opening. ALLTOP team appeared in 118A, Hall 11.36, brought many new photovoltaic products, outdoor street lights, photovoltaic energy storage and other one-stop systematic solutions, attracted more than 300 industry leading enterprises to participate in the exhibition, many visitors have stopped to visit, exchange, tens of thousands of visitors, customers together, a glimpse of the annual indu
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect