The reasonable construction of solar LED street light foundation and material selection of the correct in the whole process of the installation of lamps and lanterns has the effect that cannot ignore. Designers in the design of a solar LED street lamp installation layout before, must be conducted to install to surroundings careful investigation
solar LED street lamp base in the proper selection of reasonable construction and materials in the lamps and lanterns of the plays an important role in the installation process. Somewhere in the design of solar led street lamp installation layout before, designers must carefully check installation site surrounding environment, to avoid the unreasonable installation site. The first is to choose the principle of solar led street light installation location: ensure catchment is smooth around. If within 10 meters river and the puddle worldwide, river and pool water based surface must be less than 2 meters. No obstacles around ( According to the installation height of lamps and lanterns) And the high tension line and other dangerous goods; No cable, fiber optic cable, drains and other public facilities. Install the site underground ( Special circumstances users need to coordinate in advance) Installation of solar led street lamp note: depending on the installation site, installation personnel are responsible for the installation location of irrationality question and stop the installation, and report to the relevant principals at the first time. Before installation, ready to solar led street lamp, the tools needed to select installation personnel with installation experience; In strict accordance with the solar led street lamp base figure to choose the appropriate cement, at high soil ph choose special acid-proof alkaline cement; Fine sand and gravel must not contain any impurities that affect the concrete strength, such as soil; In strict accordance with the solar led street light base figure size ( Installation size determined by installation personnel) Along the road excavation of foundation pit; The excavation pit is placed after 1 ~ 2 days, observe whether there is leakage of groundwater. If there is leakage of groundwater, immediately stop installation progress; 5 times must be added to the battery, at the bottom of battery box on the base; ф 80 drain or according to your drawings. Basis, buried on the cage of the surface must be level ( Use level measuring and testing) To the cage, anchor bolt must be perpendicular to the base surface ( With feet measuring and testing) ; Before installation, threading pipe ends must be blocked, in order to avoid foreign bodies to enter during or after installing or congestion, caused by threading difficulty when installation or not thread; The foundation must surrounding soil compaction; Solar led street light foundation, after the completion of production need to maintain 2 ~ 7 days ( Depending on the weather) ; The basis of solar led street light only after passing the acceptance test installation. YWX [ Good quick push screen promotional 18013196696]