loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

12 m solar street light construction costs

Solar LED garden light daily installation time, questions about foundation pouring, shandong street lamps factory lighting lamps manufacturer to remind everybody, just keep in mind the following points: 1, determine the floorlamp location; Survey and geological conditions, if the soft soil 1 m 2 are the surface, then the

in solar led garden light daily installation process, the basis for pouring, shandong street lamp factory lighting lamps remind everybody to pay attention to the following: 1, determine the position of the vertical light; According to the geological survey, if the surface is 1 m ~ 2 soft soil, the excavation depth should be deepened. At the same time, make sure that the mining below position no other facilities ( Such as cable, pipes, etc. ) , street lamp at the top of the shade for a long time, otherwise should be appropriate to change position. 2. Floor lamp position reserved 1 m 3 standard pit; Embedded parts of the positioning and casting. Embedded parts are placed in the center of the square hole, one end of the PVC pipes placed in the middle of the embedded parts, the other end is placed in the place of the battery. Keep the embedded parts and foundation and the ground at the same horizontal plane ( Or screw the top with the original ground on the same horizontal plane, depending on the field need) On one side, and should be parallel to the road; In this way, we can ensure that lamp is vertical, not skewed. Then with C20 concrete pouring, or stop using the vibrator vibrating in the casting process, to ensure the overall compactness and strong degree. 3. After installation, clear in time the residual sludge of the positioning plate, and waste oil cleaning impurity on the bolt. 4. Concrete solidification process, should be watered regularly maintenance; Until the concrete completely solidified ( More than 72 hours) , to install droplight. The remarkable rapid screen sales promotion

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service