loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Yi Qixiu for solar street lamps and light, a basic understanding

The classification of the light, generally can be divided into the lift and the lift. Elevating the main stem height is generally more than 18 m, electric lift is easy to operate, lamp plate to work place, can automatically set off automatically, hanging ditch, unloading and wire rope. Lift high lamp set hand

the classification of the light, generally can be divided into the lift and the lift. Lift the main stem height generally in more than 18 m, electric lift is easy to operate. Raised to the working place, the lamp panel panel can automatically remove, hanging in the slots, wire rope can be unloaded. Lift high lamp is equipped with manual and electric hoist control mode, make the lamp panel can be safe and reliable underground dropped to the ground. 2. 5 meters, easy to maintain. Lead wire length is 10 meters of the manual remote control device, the operator in the rise and fall of 5 meters remote control lamp plate, ensure the personal safety of the operators. Lift high lamp also is equipped with a spare cable. When the lamp panel fell to the lowest position, one end of the cable inserted into a socket in the electric control system, on the other end inserted into the lamp panel in the junction box, so the lamp panel can direct power supply, lamp can repair. Lifting light, all the protection class reaches IP65 international standard of lamps and lanterns, to prevent dust and rain water from entering the, ensure the service life of the bulb. Lights are usually made of corrosion resistance of aluminum alloy and stainless steel. Install high lamp the preparation of 1. According to the loading and packing list carefully check all parts. 2. Check whether the parts is damaged, bent or distorted, zinc layer is damaged. 3. Each part of the logo on the rod body indicates the type of the rod body, the order number and the number of section. The weight of the rod body tag on the inside of the rod body with a marker pen. Nuclear delivery is correct, the crane lifting capacity will be enough. 4. According to the drawings provided by connection of maximum and minimum casing pipe marking rod body. Unit 1. Every joint with a socket length, but as a result of manufacturing, and installation error and physical factors, socket length will have change, so the biggest socket length and minimum socket length. 2. For ease of installation and may require lubrication fitting surface. Be careful not to use oil to prevent leakage and pollution of the rod body. Internal and external surfaces of the socket can use soap and water lubrication. 3. Should exert the necessary force at both ends, in order to obtain a tight socket.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
You're Invited! Visit ALLTOP at Stand H1.10 – Solar & Storage Live Nigeria 2026

Event: Solar & Storage Live Nigeria 2026
Dates: July 14–15, 2026
ALLTOP Booth: Stand H1.10 (prime location – we look forward to seeing you there!)
Address: Landmark Centre, Lagos, Nigeria
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service