loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Wind power and solar street light price traffic signal lamp shell protection grade

A test on dust test box, dust experiment, the air in the oven to keep talcum powder state of suspension, should contain the talcum powder 2 kg per cubic meter of space, talcum powder particle size of the minimum of 1 mu; 米~ 75亩; M, of which at least 50% ( Quality) The particle size of less than 5 mu; m。 Shall not

a dust, dust test test in testing room. Indoor air to keep talc powder suspension. Talcum powder content should be within 2 kg per cubic meter empty, talcum powder particle size should be at least 1 micron. M ~ 75 mu of at least 50 quality % particle size less than 5 mum. Talcum powder used for more than 20 times shall not be used for testing. Lights to hang outside the dust collection box, working under rated voltage for 1 hour. Then, working lights with the minimum interference in the dust collection box. Then, start the fan suspended talcum powder. After 1 minute, shut the power of the light, the light cooling 3 hours, and talcum powder remain suspended. After testing, visual inspection and dielectric strength test sample. Second, the waterproof test using water jet test equipment for testing. The radius of the semicircle pipe should be as small as possible, and is suitable for the size and position of light. Line of blowhole should make water directly into the center of the circle. Device entry pressure of about 80000 mpa, pipeline swing 120 degrees. The vertical line on both sides of the 60 degrees; , to complete a swing, 2 times; 120 degrees; ) About 4 seconds, light should be installed at the top of the pipe axis, so that the ends of the lamp can be completely water spray. Open the lamp power supply, make the normal work of the signal lamp, lamp at a rate of 1 r/min around its vertical axis rotation, and then use hydraulic device to the light, closed 10 minutes after the lamp power supply, light and natural cooling, at the same time continue to spray water for 10 minutes. After testing, visual inspection and dielectric strength test sample.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service