loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Talk about light, maintain what install solar street lamps should be prepared before and real

1, be familiar with drawings, clear requirements, prepare materials and tools. 2, check the mechanical parts is normal in good condition. Such as: whether parts connection bolt combined with strong, bearing lubrication, and so on, wear parts needs to be changed in time. 3, check the motor

1, familiar with drawings, clear requirements, prepare materials and tools. 2, check the mechanical parts are in good condition. Components of joint bolt, for example, if combined with strong, whether bearing lubrication, etc. , worn or damaged parts should be replaced in a timely manner. 3. Check whether the motor grounding system is reliable. Severe corrosion should be cleaning. 4, check the worm gear reducer, safety coupling and clutch. Remove oil stains and add gear oil. Check the wear condition of worm gear and worm, when gear thinning or grooved mark, to replace. Safe coupling should not be easily loose or adjustment. 5. Check carefully whether the wire rope female beheaded, loose tube defects, etc. Itself should be no deviation, loose strands, wire rope broken wires, indifference and depression, corrosion and wear obviously. Should pay special attention to portion in the wire rope and clamp. In order to prevent rust, wire rope decrease between wire rope and drum and wire rope and pulley wear, can use hard brush daub antirust oil on the steel wire rope. 6, check the limit switch, check the power cable with and without compression, stuck, the phenomenon such as damage.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service