Install solar street light is the best way to choose to have the construction experience of installation personnel; Remember in strict accordance with the solar street light foundation drawing to choose the appropriate cement, must choose in high soil ph acid, alkali resistant special cement; In the fine sand and stone can not have
install solar street light is the best way to choose to have the installation personnel construction experience. Remember in strict accordance with the solar street light to choose the appropriate cement foundation drawing, at high soil ph must choose to acid and alkali resistant special cement; Fine sand and stone shall not contain clay and other impurities that affect the concrete strength; And in strict accordance with the size of the solar street light foundation drawing ( Be determined by the installation personnel) 。 Size) Along the road digging holes; Place, after the completion of the excavation pit 2 days, to prevent leakage of groundwater. 5 times must be added to the solar street lamps at the base of the battery with this department. 80 a drain or according to your drawings. In the foundation, buried the cage on the surface must be level ( Use level measuring and testing) , on the cage of anchor bolt must be perpendicular to the base surface ( With square measuring and testing) ; Before installation, must plug the end of the threading pipe, in order to prevent foreign body during or after installing into or blockage, which makes the installation process or thread after construction difficult or impossible. Crossing a line. The foundation must surrounding soil compaction; Solar street lamp based on the production (7 days after the completion of the need to maintain The specific time can be determined according to the weather) ; Solar street light only after the foundation of qualified experience to install. Solar street lamp assembly: installation personnel must be familiar with the installation of the structure of the solar street lamps, and choose safe, close to the installation location of solar street light assembly; According to the configuration list to dismantle packaging, parts and accessories, check and check whether there is a scratch in the process of transportation, deformation and other damage. Light pole components and wearable components ( Such as solar energy battery components and lamp holder) 。 In order to avoid unnecessary damage, such as scratches in the process of installation, had better be in placed with a soft pad. Please do according to the general assembly drawing assembly solar street lamps solar street light. Installed solar street lights, solar street light the required tools and equipment: multimeter, wrench, fine lines, cable ties, shovels, and the wire ( Made from soft belt) ; If it is a steel wire rope, must be wrapped in cloth belt, or with a soft pad is good, in order to avoid damage to the lamp body, cranes, cranes, etc. Battery installation requirements: place the battery in the soil of cement tank based on solar street lamps and other impurities removed, to ensure that the drain is not blocked by foreign body; Check whether the battery is damaged, the battery voltage is normal. If there are any abnormalities, will be judged to be unqualified products, installation is prohibited. Cover with insulation belt sheathed pole. After disassembly and assembly battery box, put it in the laid in the basis of in advance. Then, in the connecting hose is installed on two pairs of steel wire hoop, cell line prefabricated pipe through the ground cage. Prefabricated pipe evenly coated with 7091 seal after silica gel layer, insert the other end of the connecting hoses prefabricated pipe root, use a screwdriver to bolt on the double wire hoop. After Pierce the battery wires from prefabricated pipe, insert the punctured hose. Two pairs of steel wire hoop on the puncture of the hose. Punch 7091 sealing silicone hose evenly, and insert the prefabricated pipe roots. Double wire hoop application screwdriver screw down the bolt. Finally, the battery wire and fixed in the nozzle. From the cover plate is placed on the basis of in place to remove dirt, sand and other impurities. Adjust the cover plate, and place it smoothly in the base. When placed flat, prevent sediment fell into the foundation around the foundation; With asphalt and fine sand ( Asphalt: fine = 1:3) A mixture of cover plate, plate around 40 mm; Filling clay soil or triad. When the filling clay soil or triad, every 10 centimeters of packing by compaction, until its 10 cm above the ground.