loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Solar street lamp lighting company to lamp posts how to maintain

Solar street lamps are not need not tube after the installation is complete, but regular maintenance, especially the light pole, so solar energy lamp posts how to maintain? 1, check the light pole lighting all the black metal artifacts ( Including the inner wall of the light pole) Hot dip



solar street lights are not need not tube after the installation is complete, but regular maintenance, especially the light pole, then how do you maintain solar light pole? 1, check the light pole lighting all the black metal artifacts ( Including the inner wall of the light pole) The hot dip galvanized 【 Hot dip galvanized, 镀锌) Also called hot dipping zinc and hot galvanizing, is an effective way of metal corrosion, mainly used for metal structure industry facilities. 】 Corrosion situation, fastener locking measures is in accordance with the requirements. 2, check the light pole lighting verticality, lever error should be allowed a little less than 3 ‰ of high lever. Light pole axis straightness error' Beating straightness error is refers to each point on the straight line or the degree of deviation from the straight line. 】 Shall not be greater than the rod length of 2 ‰. 3, check the outside surface of lamp posts and weld corrosion situation, to experience a long standing but cannot to change again, when necessary by ultrasonic and magnetic particle inspection ( Using the workpiece defect magnetic powder flaw detection of leakage magnetic field and the interaction of magnetic powder, it USES the steel surface and near surface defects ( Such as cracks, slag inclusion, hair lines, etc. ) Permeability and steel permeability difference, these materials after magnetization of the magnetic field discontinuity distortion will occur, forming part of the magnetic flux leak occurs on the surface of workpiece leakage magnetic field, so as to attract the magnetic powder form of defect magnetic powder - — Magnetic mark, under the condition of appropriate lighting, showing defects location and shape, observation and interpretation on the accumulation of these magnetic powder and magnetic powder flaw detection is realized. 】 Such as test method to test the weld and test. Check: (4, protective earthing and lightning protection device 1) Metal lamp posts and metal shell should have good grounding protection, electrical equipment with the grounding resistance meter [ The advantage of the grounding resistance meter wide measuring range, high resolution, the range is 0. 0 01 Ω ~ 1000 Ω, resolution. 01 Ω, to 0. 7 Ω below ground resistance, can be measured accurately. 】 Test grounding resistance should be not more than 10 ohms. ( 2) Check the lightning rod 【 Lightning, and lightning protection needle, is used to protect buildings, tall trees, etc to avoid lightning device. 】 Fixed. 5, base plane of the panel is measured with level, combined with the light pole of verticality test results, analysis of uneven settlement of foundation, and make the corresponding processing. 6, yangzhou lamps manufacturer right road lighting effects of light pole in the measured on a regular basis.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service