Install solar street light is best choose installation personnel with construction experience; Remember to strictly according to the solar street light foundation figure to choose suitable cement, the high soil ph must choose special cement resistance to acid and alkali; May not have in the sand and gravel soil such as shadow
had better choose to have the construction experience of installation personnel to install solar street light; Remember in strict accordance with the diagram the basis of choosing appropriate cement, solar street lamps at high soil ph must choose special cement resistance to acid and alkali; Fine sand and gravel must not contain any impurities that affect the concrete strength, such as soil; In strict accordance with the size of the solar street light foundation drawing ( Installation size determined by installation personnel) Along the road, the excavation of foundation pit; Placed after the excavation pit 1 ~ 2 days, to prevent the groundwater seepage. 5 times must be added to the battery, at the bottom of battery box on the base of the solar street lamps; ф 80 drain or according to your drawings. Basis, buried on the cage of the surface must be level ( Use level measuring and testing) To the cage, anchor bolt must be perpendicular to the base surface ( With feet measuring and testing) ; Before installation, threading pipe ends must be sealed to avoid foreign bodies to enter during or after installing or congestion, caused by threading difficulty when installation or not thread; The foundation must surrounding soil compaction; Solar street lamp base, after the completion of production need to maintain 2 ~ 7 days ( The specific time can be determined according to the weather) ; Solar street light only in the basis of qualified solar street lamps before installation. Solar street lamps assembly: installation personnel must be familiar with the installation of solar street light structure, and select the safe locations near the installation site for solar street lamps assembly; Remove the packaging, parts and accessories, according to the configuration list inventory check whether there is a scratch in the process of transportation, deformation and other damage; The best and easy to wear accessories (lamp components Such as solar cell components, lamp holder, etc. ) Put together. ) With a soft mat, in order to avoid unnecessary damage, such as scratches in the process of installation; Remember to refer to general assembly drawing assembly solar street lamp, solar street lamps Installed solar street lights, solar street light the required tools and equipment: multimeter, wrench, fine wire, cable tie, shovels, and the wire ( Soft belt; If it is a steel wire rope, must use a cloth or with a soft pad is good, in order to avoid damage to the lamp body, cranes, elevators, etc. Battery installation requirements: removal of solar street light the cement tank battery is set in the basis of dirt and other material, to ensure that no foreign bodies blocked in the drain; Check whether the battery is damaged, the battery voltage is normal. To determine if abnormal, the unqualified products, installation is prohibited. Wrapped with insulating tape sheathed wire poles. After disassembling the battery storehouse, in the embedded foundation, and then put two double hoop on connecting hoses, then put the battery line through the cage of prefabricated pipe. The prefabricated pipe evenly coated with a layer of 7091 after sealing silicone, will connect the other end of the hose inserted the roots of the prefabricated pipe, with a flat head screwdriver tighten bolts on double straps. When the battery after wear a line from the prefabricated pipe, put a threading hose, with two double hoop, uniform coating a layer of 7091 on prefabricated pipe sealing silicone, then insert the thread tube prefabricated pipe root ministry, with a flat head screwdriver bolts on the double hoop, finally to fix cell line in the nozzle. Eliminate cover plate is placed in the foundation of dirt, sand and other impurities; Adjust the cover plate, put it in and on the basis of stability. When placed flat, avoid sediment fall into basis; With asphalt and fine sand ( Asphalt: fine = 1:3) A mixture of cover plate and the surrounding 40 mm; ; Filled with clay or clay. When the filling clay or three stone soil, filling time, every 10 cm and consolidate to 10 cm above the ground.