loading

We are a leading manufacturer of solar power utilization and lighting systems                   Mob:+86 199 2801 5868

Solar panels, solar water heating technology mainly refers to configuration controller

The main technique index sign of the solar panel configuration controller in order to make the controller can work more effectively and to its performance also has certain requirements. 1. No-load loss, should as far as possible to reduce the static current controller in order to improve the photovoltaic system

solar panel configuration controller main technical indicators in order to make the controller work more efficiently, on its own performance has certain requirements. 1. The static current controller of empty load loss should reduce as far as possible, to improve the conversion efficiency of photovoltaic system. Static current controller should be as low as possible, its largest consumption should not exceed 1% of its rated charging current. 2. Pressure drop loop controller charging or discharging circuit of voltage drop shall not exceed 5% of the rated voltage system. 3. Vibration resistance in 10 ~ 55 hz environment, equipment in the three axial vibration can still work normally after 30 minutes, the amplitude of 0. 35 mm. 4. Impact resistance when the battery voltage from the circuit, the controller must be able to bear 1 in 7 hours. 25 times the open circuit voltage rating of the solar cell module. 5. Impact resistance current solar panels configuration controller must be able to withstand higher than that of the solar cell module in 1 hour 1 rated short circuit current. The impact of 25 times. Must be able to switch controller switch components under the condition of no damage to switch the current. Controller has three to the terminal, respectively, and the solar cell phalanx or inverter, battery and DC load connection. Connection is important to note that the controller of the positive respectively with three solar panels matrix, storage battery and DC load connected to the anode, cathode are connected to the corresponding component of the cathode, polarity reversal. Relevant tags: makers of solar panels, solar panels, high efficiency solar panels, guangdong energy technology co. , LTD

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service