Install solar street light is best choose installation personnel with construction experience; Remember to strictly according to the solar street light foundation figure to choose suitable cement, the high soil ph must choose special cement resistance to acid and alkali; May not have in the sand and gravel soil such as shadow
the installation of solar street light is best done by the installation personnel with construction experience. Remember that in strict accordance with the solar street light foundation drawing to choose the appropriate cement, at high soil ph must choose the special cement of acid and alkali resistance; Fine sand and gravel shall not contain soil and other impurities that affect the concrete strength; Excavation shall be carried out in strict accordance with the size of the solar street light foundation drawing ( Installation size determined by installation personnel) 。 Should leave after excavation pit 1 ~ 2 days, in case of groundwater seepage. A battery pack on the base at the bottom of the solar street lamps, must add five times. ф 80 drain or according to your drawings. Basis, buried on the cage of the surface must be level ( Use level measuring and testing) To the cage, anchor bolt must be perpendicular to the base surface ( With square measuring and testing) ; Before installation, threading pipe ends must be blocked in case during the installation or after foreign bodies to enter or congestion, caused by threading difficulty when installation or threading. The foundation must surrounding soil compaction. Solar street lamps shall be the basis of 2 ~ 7 days after completion of the production to keep, The specific time can be determined according to the weather) ; The installation of solar street lamps must be based on the solar street light after passing the acceptance test. Assemble: solar street lamps installation personnel must be familiar with the installation of the structure of the solar street lamps, and select the safe locations near the installation site to assemble solar street light; Dismantle packaging, parts and accessories, according to the configuration list inventory check for scratches and deformation in the process of transportation damage, etc. Light pole attachment and wear components ( Such as solar cell components, lamp holder, etc. ) Had better use cushion filling, in order to avoid unnecessary damage, such as scratches in the process of installation. Remember the reference solar street lamp assembly drawing to assemble solar street light. Installed solar street lights, solar street light the required tools and equipment: multimeter, wrench, fine wire, cable tie, shovels, and the wire ( Soft belt production; If it is a steel wire rope, must be wrapped in cloth belt, or with a soft pad is good, in order to avoid damage to the lamp body, cranes, forklifts, etc. Battery installation requirements: removal of solar street light the cement tank battery compartment is set in the basis of dirt and other impurities, to ensure that no foreign bodies blocked drain holes; Check whether the battery is damaged, and at the same time check whether the battery voltage is normal. If there are any abnormalities, will be judged to be unqualified, installation is prohibited. Wrapped with insulating tape sheathed wire poles. Battery removal after assembly, in the prefabricated foundation, and then the connection position two two-wire hose hoops and the battery line through the cage of the prefabricated pipe, uniform coating a layer of 7091 on prefabricated pipe sealing silicone, will connect the other end of the hose inserted the roots of the prefabricated pipe, use a screwdriver fastening bolts on two-wire straps. After wear a cell line from prefabricated pipe, the threading position a threading hoses, hose in threading position two two-wire hose hoops and uniform coating a layer of 7091 on prefabricated pipe sealing silicone, insert the thread tube prefabricated pipe root, use a screwdriver to two-wire coupling bolts, the last to fix cell line in the nozzle. Remove placed flat on the ground of soil, sand and other impurities; Lifting adjusting plate on foundation, the smooth place. Placed flat, prevent silt around the base into base inside; With asphalt and fine sand ( Asphalt: fine = 1:3) A mixture of cover plate and cover 40 mm; Around the cover plate; Clay or cement filled in. When the filling clay or composite soil, filling time, every 10 cm and consolidate to 10 cm above the ground.