Led lights factory is light pole?

LED road lamp installation a. Preparation work in advance in the disassembly and assembly address selection: remove the address should be the installation around, easy to assemble after delivery. In addition, the installation address covered by rain wear, implantation due to the road bumps or sand and dirt and damage

the LED road lamp installation

a. Preparation work in advance in the

disassembly and assembly address selection: remove the address should be the installation around, easy to assemble after delivery. In addition, the installation address covered by rain wear, implantation due to the road bumps or sediment and dirt and damage, scratch and contamination etc.

b。 Street lamp parts assembled

street lamp parts assembled according to the steps to carry out the assembly ( Install pick arm & rarr; Install lighting & rarr; Assembled lamp parts & rarr; Lighting lamps and lanterns of inspection)

c。 Project construction key point

used cranes, specially made buckle lock ( Slide, solid, discharged from pine convenient handling) , rope, lifting point ( Pole high 1/3) Beyond the 4th level wind installation. Use dry forced cement mortar or cold-rolled steel ground leveling, alignment with the vertical ball method, attention after installing bolts at once.

( 7) The cable laying and electric equipment installation

a. The cable laying

1) Cable entry inspection acceptance of work

after the cable entry, be sure to check of the cable to carry out detailed engineering acceptance, inspection, model specifications, rated voltage of cables, length, the mark of certificate of quality, high temperature resistant flame retardant; Its thickness and sampling on the spot inspection cable sheath and the diameter of the ring wire core.

2) Cable laying in advance to prepare

technical advance preparation: scientific research electrical shop drawing attentively, grasp the condition of cable around, to carry out the serial number for each cable, and cable's start-stop parts, control loop number, specifications, etc. ; Gathered on the cable area, drawing model of cable distribution, display information cables in the jumper position; Fusion model of cable distribution, and choose the best cable laying order, decrease as far as possible the status of the cable a job; Workers and machines are prepared ahead of time.

are prepared ahead of time: on the spot check the jumper is installed and brace load condition, jumper and remove dirt; Remove cable laid along the road block, to put cables make very good standard.

3) Cable installation

before laying, cable insulation layer should shake test, 500 v when the grounding resistance value is not less than 2 m & Omega; Before closing the, shake test once again.

edge of cable, cable joint, turning area, should be placed direction, the direction is marked the route number, when number disorderly, should indicate the cable type, specifications and all address; Series cable need to be ordered, direction handwriting is clear, it is not easy to fall down; Giving directions specifications must be consistent, can anti-corrosion materials, hanging wall should be strong.

line pipe laying cable, laying cable makes the cross section of design scheme and standards; Cable laying, cable should be from the top of the tray to find out, should prevent cables in supporting frame and the surface friction drag their feet; Cable is not not clear on the machinery and equipment damage.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service