Light, large volume, stem height, during the installation process requires consideration of many external factors, therefore the installation personnel must be very cautious, energy-saving high lamp manufacturers {here is shandong 。 jschindo。 com} Beam technology for you a brief introduction about the light, the installation process
due to large size and height of the high beam, during the installation process need to consider many external factors. Therefore, the installation personnel must be very careful. Here is shandong energy-saving high beam factory installation considerations of high beam beam technology, hope to be of help: ( 1) When installation should be paid attention to. Must tighten connection of beam fixed nut with a wrench. Often as you can see, the light of the lamp holder drooping down because no fixed screw, fall can cause personal injury. ( 2) High light pole generally consists of two or three steel pipe. Two pole insertion depth shall not be less than 60 cm. At the top of the hook position basically consists of three M14 or M16 screw connection. Should be paid attention to during the installation process, the three screws must be stainless steel screws. Many high lamp manufacturers ignored using ordinary galvanized screws. As time goes on, the latter will become serious rust, makes decoupling it difficult or impossible. ( 3) After light problems, lamp panel to raise. If in high lamp light plate installed a led lamp, lamp at the back of the drive power is divided into zero, wire and ground wire. Wiring and grounding wire must be connected to a decorated the main cable connection in advance. If the drive power supply ground wire is not connected, it was burnt down in thunderstorms from time to tome. ( 4) Also must pay attention to the operation of the connector. Wire connection must flush with tin, and then with insulating tape, pipe with flame retardant wax package again. Aim is to avoid circuit under high temperature and rain exposure rapid aging, lead to light, short circuit. Some manufacturers don't think some plastic powder on the steel tube is insulated. If spraying plastic powder on the lightning rod, lightning rod will not conductive effect. If found such problem during the installation, you must notify the installation personnel. Lightning rod at the top of the plastic powder must shave at least 25 cm from top to bottom. Then, in the rain hat and the joint of the lightning rod, with lightning rod fixed top silk pushes away the lightning rod of plastic powder, with normal conduction. ( 5) At the same time, some of the considerations for installation should be according to the manufacturer. The second is to install shock absorber, for large vehicles off the road are more likely to make the ground vibration, if long time driving, the lights will become loose. Finally the installer Settings, it must refer to relevant specifications, to avoid the installation errors, and can't normal use. ( 6) Every joint with a socket length, but as a result of manufacturing, and installation error and physical factors, socket length will have change, so the biggest socket length and minimum socket length. ( 7) For ease of installation and may require lubrication fitting surface. Be careful not to use oil to prevent leakage and pollution of the rod body. Internal and external surfaces of the socket can use soap and water lubrication. ( 8) Should exert the necessary force at both ends, in order to obtain close socket connectors. ( 9) After hoisting in place of lamps and lanterns, the technician is responsible for the high lamp calibration, debugging, wiring and lighting. Professional electrician responsible for checking, transmission and distribution power lines, handyman responsible for organizing construction phenomenon. ( 10) Lamps and lanterns of finished installation and debugging, after the normal lighting lamps and lanterns, technical personnel will be light, all technical data transferred to the designated professionals ( Or the unit professional electrician) Detailed guidance, light, some specific operational problems in the maintenance, and installation work.