loading

We are a leading manufacturer of solar power utilization and lighting systems

How to optimize industrial solar power with solar panels

Power optimizer ( 功率优化器) Is not the inverter, it is a dc to dc current control buck boost converter ( DC - 直流巴克/提高转换器) , in other words, it is a single set of level of MPPT. Power optimizer for a single set of parts for maximum power

the optimizer is not inverter power, but by the DC to DC - DC current control DC buck/boost converter.

in other words, the converter is MPPT level of the individual components. Optimization of individual components in the power optimizer maximum power, it is transmitted to the terminal inverter DC - Ac conversion process, and then provided to civilian or power in order to access the Internet. Terminal inverter can usually is not pure inverter with MPPT, also can be equipped with two levels of MPPT inverter. On the market at present the mainstream of power optimizer is usually divided into series and parallel model, adopted by the control topology is also different. The design concept of serial bus topology with fixed voltage. Voltage of the inverter control panel according to the exchange, in short, to determine the stability of the DC

the bus voltage, at the same time to collect each series optimizer collect maximum power, and then calculate the output current and Zigbee wireless transmission to the optimizer or PLC. At this point, each optimizer is the output voltage is equal to the maximum power divided by line current component collection. When the component is blocked, the optimizer will according to the IV curve to determine the maximum output power, and through the purple bee wireless or programmable logic controller to its transport to inverter control panel. To maintain the DC

in the bus voltage constant under the premise of control panel will recalculate line current ( Reduce) And feedback to each of the optimizer. At this point, the shielding component of power is reduced, the optimizer will buck to confirm the output current is in conformity with standards. Other uncovered components of the optimizer will gradually increase to meet the output current. If the component is blocked too serious, power optimizer will bypass the components, until it is returned to the operational state. This regulation is actually a process of voltage is added, thus provide inverter H bridge that the DC voltage of the best. More information about solar panels, please continue to pay attention to zhongshan - solar panel manufacturers Guangdong energy technology co. , LTD. Relevant tags: solar panel manufacturers, power generation of solar panels, high efficiency solar panels, solar panels, guangdong energy technology co. , LTD

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
CCTV Authority Spotlight: Alltop's Innovative Energy Storage Products Shine at Canton Fair

CCTV featured Alltop's innovative energy storage products at the Canton Fair, highlighting the company's technological strength and market leadership. The brand drew significant attention and orders at the event, with its booth attracting global visitors and showcasing advanced renewable energy solutions. The coverage underscored Alltop's expertise in energy storage systems and smart solar lighting, earning national recognition for its innovation.
Invitation | From October 15th to 19th, ALLTOP invites you to attend the 138th Canton Fair together!

The 138th China Import and Export Fair

Date: Oct. 15th-19th, 2025

Booth No.:14.3F33-34G10-11

Add: China Import and Export Fair Complex (Canton Fair Complex)
Global Witness, Technological Breakthrough! ALLTOP Showcases Comprehensive Solutions at Solar PV & Energy Storage World Expo

Solar PV & Energy Storage World Expo

The 17th Guangzhou Intl Solar Photovoltaic & Energy Storage Exhibition

th No.:10.2 B551

Date: 8th-10th, August 2025

ADD: Area B, China Import & Export Fair Complex, Guangzhou
Leading the future of green energy storage, ALLTOP will appear at the 137th Canton Fair

Exhibition name: 2025 THE 137TH CHINA IMPORT AND EXPORT FAIRExhibition date: April 15-19, 2025Booth No. : 14.3 f33-34g10-11/14.2 D13-14-15Address: China Import and Export Fair Hall (Canton Fair Hall)
Somali municipal project: ALLTOP solar street lights light a green future
Project name: A municipal project (solar street lamp) in Somalia was successfully implemented
Date: January 04, 2025
Project location: Somalia
Quantity and specific configuration: 500 sets of 0278-400W solar street lights
no data
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service
detect