How do lift high lamp (cable construction street lamp installation

Lift high lamp light conditions, the system of invasion and air pollution as a result of the long-term sun, rain and snow, in order to ensure high lamp normal operation, should maintenance once every six months. A professional repair work must be of high lamp lighting system, lift system,



lift high lamp 【 Light, generally refers to more than 15 meters steel conical light pole and high-power modular fixtures are composed of new type of lighting. 】 Light conditions, the system of invasion and air pollution as a result of the long-term sun, rain and snow, in order to ensure high lamp normal operation, should maintenance once every six months. A professional repair work must be of high lamp lighting system, lift system item by item, inspection, processing defects and maintenance in time, to improve its service life and major maintenance projects:

( 1) Check whether the mechanical components normally in good condition. Such as: whether parts connection bolt combined with strong, bearing lubrication, and so on, wear parts will change in time;

( 2) Check if the grounding system of the motor, rust corrosion is serious for derusting processing solar lamp;

( 3) Check the worm gear and worm reducer 【 Worm gear and worm reducer is a kind of dynamic convey institutions, using gear speed converter, motor ( The motor) Number of rotary rotary deceleration to want, and get a larger torque. 】 The safe coupling, Safety coupling ( Also called a torque limiter, torque limiter, safety clutch) , is one of the connection machine actively and work pattern in parts, the main function of overload protection, torque limiter is when required due to mechanical failure or overload torque than the set value, it is in the form of sliding limit the transmission of torque by the transmission system, after the overload situation disappear on its own recovery. 】 And the clutch. Remove oil dirties, add gear oil. Check the worm gear and worm' Worm and worm wheel mechanism is used to transfer between two alternating axis movement and power. 】 Wear and tear, when gear thinning or have the trench shall be replaced. May not be easily loose or adjust the safe coupling;

( 4) A careful examination of wire rope lock mother card buckle should not have broken head, loose tube defects, such as wire rope itself should not have bias, scattered, broken wires, indifference and depression, the phenomenon such as corrosion and obvious wear, it is important to pay special attention to the points of rope and steel wire rope clip. In order to prevent rust and reduce wire rope between wire rope and wire rope with the drum, roller wear and antirust oil available hard brush to coating on the steel wire rope;

( 5) Check the limit switch, check the power cable insulation aging, compression, the clip, the phenomenon such as damaged.

GET IN TOUCH WITH Us
recommended articles
Knowledge News & events Project
ALLTOP Cordially Invites You | Join Us at WETEX 2026 Dubai Solar PV Exhibition to Explore New Opportunities in the Middle East PV & Energy Storage Market!


Exhibition Name: WETEX 2026
Exhibition Dates: October 20–22, 2026
Venue: Dubai World Trade Centre · Dubai, UAE
ALLTOP Booth: 4C14
Warm Invitation | ALLTOP Debuts at the 140th Canton Fair, Jointly Witnessing a New Future of Green Energy

Exhibition Name: The 140th Canton Fair)
Exhibition Dates: October 15–19, 2026
Venue: China Import and Export Fair Complex, Guangzhou, China
ALLTOP Booth: Zone C · Hall 16.4 · Booths C34-C35, D08-D09
Golden Topping-Out Marks a New Milestone, Output Value Exceeds RMB 600 Million! ALLTOP Industrial Park’s 168,800 m² Project Successfully Topped Out

318 Days—Less Than a Year!

At the “Speed of Light,” from Blueprint to Topping-Out.

50.24 mu of Prime Land, 168,366 Square Meters of Intelligent Manufacturing Space,

Annual Output Value at Full Production Exceeding RMB 600 Million.

ALLTOP Speed, Formidable Strength, and a Promising Future!

Golden Topping-Out Shines, Output Value Soars
The Hype Is On! ALLTOP Draws Global Spotlight at the Solar Expo — Join Us for a Chat
SOLAR PV & ENERGY STORAGE WORLD EXPO 2026

Booth No.: 10.2· B551
Time: September 16–18
Address: China Import and Export Fair Complex, Guangzhou, China (No. 382 Yuejiang Middle Road, Haizhu District, Guangzhou)
ALLTOP UGANDA Invites You to Power and Elec Expo 2026

Exhibition Name: Power and Elec Expo 2026

Date: July 9th-11th 2026

Company Name: Alltop Engineering Uganda

Hall No.

Booth No. A45

Venue: UMA Show grounds, Multi-Purpose Hall, Kampala-Uganda
Our aim is to provide the best products and the most considerate service for customers.
About Us
Customer service