14 mm, 27 mm, tool preparation: the sleeve wrench 14 mm, 27 mm, chisel, a hammer, diagonal cutting pliers, electrical tape, 10 mm steel wire rope first 12. Material preparation: 6 strands of hemp core hot-dip zinc wire rope 10 mm length is 33 meters, three root. 30 m old electric
tools preparation: sleeve & phi; 14 mm, phi; 27 mm, wrench & Phi14 mm, phi; 27 mm, chisels, hammers, diagonal cutting pliers, electrical tape, phi; 12 10 mm wire rope tie rod head. Material preparation: 6 strands of hemp core hot-dip zinc wire rope & phi; 10 mm length is 33 meters, there are three. A 30 m long cable (old Or 30 meters long rope) 。 High lamp panel wire rope replacement steps: 1. Remove the lamp plate to support position, main cable fixed clamp, wedge and dismantle lamp plate bundle three old rope on the head. 2. Unloaded the ends of the wire rope shall be respectively with three new rope cross, to scoop out firmly. Joint should not be too big, weave the joint application of electrical tape package, tape shall be smooth and too much, to glance through the pulley. In addition, the end of the cable with a connector on the old cable, to prevent the next pull the main cable, cable slip and fall. 3. Slowly pull the main wire rope from the inner side of the pole to the outside, let the old and the new rope weaving head slowly through the pulley, until the pole distribution of steel cable coil out from the bar. 4. According to the cable towards the location of the distribution plate, the installation position of reference at the top of the cable and wire rope pulley, demolition of the distribution plate in turn old wall, and in turn counterclockwise the other end of the new ropes and wire rope knot head butt. At this point, the new one end of the rope in the lamp panel with the old one end of the rope winding, weaving head across the bar at the top of the pulley. At the other end and pole points under the wire disc old rope tied head, forming a closed loops. 5. From the inside to the outside lever pull wire rope, docking until cross weaving points is pulled outward, to cut off the old and new wire rope weaving, a new wire rope is fixed on the line board. 6. Repeat steps 5, fixed two other cable. 7. Slowly is outside of the rod down with three old wire and cable. The main wire rope should be pulled by someone, so as not to fall under gravity is too fast, wire rope or cable will emerge from the pulley. Pull until the rope around completely back to the drum. 8. At this time, the new one end of the wire rope is fixed on the wire distribution board. At the other end is on an old rope, pull to the link below. Demolition of the old and new wire rope and tied bundle end of the cable. 9. According to the top of the installation position of cable and wire rope pulley, the new steel wire rope end respectively fixed in the lamp panel wedge binding head. Then, fixed the main cable. 10. Lift the lamp panel, see if it is 5 cm tall. If you don't even, adjust each pair of rope. 11. Lamp panel after leveling, install the lamp panel, complete the change line working. Shandong street lamp lighting factory ( 。 jschindo。 com) Co. , LTD. Is a company specializing in the production of solar street light, high lamp, garden lamp, landscape lamp and led street light. It has more than 15 years of production experience, high quality, low price and honesty. Welcome new and old customers to come to consult.