The high pole lamp can be seen everywhere in daily life outside. It has an atmospheric shape, a wide range of light, and all-round illumination, which brings light to our night. So everyone knows what work needs to be done before and after installing high pole lights? Next, the editor will introduce the work process before and after the installation of the high pole lamp.

The height of the high pole lamp varies from mm. The pole adopts a polygonal shape, usually side/side/side, and a plug-in type structure. Among them, the common m, m, and m height products are different in the upper caliber, lower caliber, pole section, upper section wall thickness, and lower section wall thickness of the pole. The specific design is based on the needs, and different heights are required. With different calibers, the poles of the high pole lamps are basically hot-dip galvanized and sprayed. It is often applied to places such as city squares, stations, ports, airports, parking lots, stadiums, and overpasses.

1. The work to be prepared before installation of high pole lights:
Before installation, carefully check whether all components are complete according to the loading and packing list. Check whether the component parts are damaged, bent, twisted, etc. If damage occurs, replace parts in time. This can be said to be very important. If quality problems are discovered after the installation is completed, both replacement and maintenance will become very complicated. Therefore, it can be said that it is more effective to check these before installation. The signs on each section of the rod will indicate the type of rod, the order number and the number of sections. If there is a mismatch, the work must be terminated in time for replacement and deployment. It is also very troublesome to check afterwards.
  
2. The work of high pole lamp installation
Each splicing place will provide the length and size of the socket, but it will be affected by errors or physical factors during installation. In order to make the installation convenient and quick, you may need to use lubrication. Note that lubricating oil cannot be used to prevent leakage and contamination of the rod body, and soapy water can be used to sleeve the inner and outer surfaces. Appropriate force should be applied to both ends when socketing to obtain a tight socket. In this process, you should not only pay attention to the close connection during installation, but also ensure your own safety. After all, safety is the top priority of all our construction.
  
3. Inspection after installation of high pole lights:
After the high pole lamp is installed, you must carefully check it. Turn on the power to check the status of the switch, check whether it can work normally, whether the screws are in place when installing, whether there is any looseness, etc. If there is any, please replace it. At this time, it is too late to find any errors. As long as you make timely corrections, the high pole light will still exert its excellent performance.

In short, the high pole lamp is not only convenient for our lives, but also has its complexity. Everyone can make the best use of their strengths and avoid weaknesses by doing these tasks when installing them.