Solar Light Factory School Precautions for installation of solar street light foundation-ALLTOP-img
loading

[Solar Light Factory School] Precautions for installation of solar street light foundation

by:ALLTOP      2021-03-05
In fact, the installation of the foundation of solar street lights is very important. If it is not done well, it is easy to cause the solar street lights to tip over, that is, it is easy to be damaged by the solar street lights, and the safety of pedestrians cannot be taken care of. Therefore, we are installing foundation lights. There are a few important points to pay attention to. 1. After excavating the street lamp foundation pit, confirm the buried position of the battery box. It is appropriate to be about 0.5 meters away from the light pole, and the area is about 3 times the area of u200bu200bthe battery box. The depth varies from region to region, generally 60 -120CM2. If 1.2 meters of the ground surface is soft soil, the excavation depth should be deepened; the pit excavated at the position of the vertical lamp should be positioned and poured for the embedded parts. 3. Before pouring, use plastic cloth or cloth to thread the PVC pipe Seal both ends tightly to prevent concrete from entering the pipe and causing blockage. The viscosity of the concrete should be moderate, not too thin or too thick; 4. The incoming concrete should be properly supplied according to the number of workers, so as not to cause the concrete to wait too long and affect the quality of the foundation; 5. Before the foundation pit is poured Preparations should be made, such as the height of the foundation pit, whether there is debris, if there are pipelines in the foundation pit, the leader should be notified in advance to properly handle it; 6. After the construction is completed, the residual mud on the positioning plate should be cleaned in time and cleaned with waste oil Impurities on the bolts, or wrap tape on the screw before embedding. 7. During the concrete solidification process, water should be regularly watered and cured. The chandelier can be installed only after the concrete has completely solidified (usually 4-7 days); the last point to note is , The installation foundation of solar street lights starts from the digging of the pit to the end of the installation. If the construction section is already open, barrier measures must be taken to prohibit pedestrians and vehicles from entering the construction site. This information is exclusively provided by the solar lamp factory lighting, source: http://./
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...