Garden lamp installation and construction method

by:ALLTOP      2021-02-24
1. Installation and construction method of courtyard lights u003cbru003e u003cbru003e 1. Measurement stakeout: Strictly locate the location according to the markings in the construction drawings, and use the level to stake out according to the reference points and reference elevations delivered by the resident supervision engineer, and submit the resident supervision engineer for inspection. u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e 2. Foundation pit excavation: excavate the foundation pit in strict accordance with the design requirements of the elevation and geometric dimensions. After the excavation, the foundation should be cleaned and the foundation should be compacted. u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e 3. Foundation pouring: The street lamp foundation is related to the strength and stability of the sign, which is the focus of this project. For this purpose, it must: u003cbru003e u003cbru003e u003cbru003e (1) In strict accordance with the material specifications specified in the design drawings and the rolling method specified in the technical specifications, the foundation steel bars are rolled and installed, and verified by the resident supervision engineer. u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e (2) The foundation embedded parts should be hot-dip galvanized. u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e (3) Concrete pouring must be in strict accordance with the material ratio and fully stirred evenly, pouring in horizontal layers, and the thickness of vibrating tamping shall not exceed 45cm to prevent separation between the two layers. u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e u003cbru003e(4) The concrete is poured in two times. The first time is about 20cm above the anchor plate. After the initial solidification of the concrete, the scum is removed, the embedded bolts are accurately corrected, and the remaining part of the concrete is poured. And to ensure that the installation level error of the foundation flange is not more than 1%.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...